NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/102 GREENWICH 1001054, 53/37
Document / 44 pages

Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37

Page image
Scanned page image, NYC-WTC_000128572
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

placed around the pipe at each end where the glove bag will be attached. This permits a good surface to which to seal the ends of the glove bag, and it minimizes the chance of releasing fibers when the tape at the ends of the glove bag is peeled off at the completion of the project.

1. Slit the top of the glove bag open (if necessary) and cut down•the sides to accommodate the size of the pipe (about two inches diameter). longer than the pipe

2. Place the necessary tools into the pouch locate inside the glove bag. This will usually include the bone saw, utility knife, rags, scrub brush, wire cutters, tin snips and pre-cut wettable cloth. Cut out a donut shape in the cloth with the inner diameter one-half inch small than the diameter of the pipe beneath the insulation. The outer diameter of the donut should be three inches longer than the diameter of the pipe insulation being removed. Finally, cut a slit in each of the two donuts so then can be slipped around the pipe. A piece of cloth that can be easily bent around the surface to be cleaned may be used instead of the donut-shaped cloth.

3. One strip of duct tape shall be placed along the edge of the open top slit of the glove bag for reinforcement.

4. Place the glove bag around the section of pipe to be together through the reinforcing duct tape. Staple worked o and staple the top at intervals of approximately one inch. Next, fold the stapled top flap back and tape it down with a strip of duct tape. This should provide an adequate seal along the top. Next, duct tape the ends of the glove bag to the pipe itself, previously covered with polyethylene or duct tape (see (d) 1 above). The bottom seam of the glove bag shall be sealed with high quality duct tape or equivalent to prevent any leakage from the bag that may result from a defect in the bottom seam. 5. Before the commencement of the abatement work, but after the glove bag is attached, the contractor shall smoke test each glove bag to ensure that it does not leak. The asbestos safety technician shall personally witness the smoke testing of each of these glove bags. Using the smoke tube and aspirator bulb or other approved smoke generating device, place the tube into the wetting agent sleeve (two-inch opening to glove bag). Fill the bag with visible smoke. Remove the smoke tube and twist the wetting agent sleeve to close it. While holding the wetting agent sleeve tightly, gently for smoke leaking out, especially at the top and squeeze the glove bag and look ends of the glove bag. If leaks are found, they shall be taped closed using duct tape and the bag shall be re- tested.

Exception: If negative pressure is established and maintained at .02 inches, w.c., smoke testing of glove bags is not required.

NYC-WTC 000128572

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128572Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127792

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗
Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000104853 · Box DEP Box 36

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

Cited alongside this record in an Ask answer

Compare copies and versions →