114 LIBERTY 2 OF 2 — page 6
NYC 9/11 Public Portal Document «___________ Parameter Clearance Level Note Asbestos in air 0.0009 ficc PCMe
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
NYC 9/11 Public Portal Document «___________ Parameter Clearance Level Note Asbestos in air 0.0009 ficc PCMe
Safeway Environmental Corp Trio Asbestos Removal Corp. Benjamin Kurzban & Son Control, Inc.
Summary Cover page for a fax transmission containing environmental test results or correspondence related to Independence Plaza.
The carpet was analyzed for asbestos following the Ultrasonic Carpet Method described In EPA/600/J’93/167. Thank you for consulting MVA, Inc.
Summary Laboratory analytical report documenting dust characterization and environmental contamination assessment results from facility testing.
h Project Date Asbestos
Summary Fragmented text or image data from a record related to the 114 Liberty Street environmental cleanup project.
Sincerely, Trio Asbestos Removal corp. ^rd^ Salame oj^t officer.
NYC 9/11 Public Portal Document Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Worker: shall mean asbestos handler and/or asbestos handler supervisor, or approved equivalent. 16
Worker: shall mean asbestos handler and/or asbestos handler supervisor, or approved equivalent.
Summary Application form submitted to DEP for an asbestos inspection or abatement project at 100 Church Street.
Ail other areas of respective floors, in which bulk samples testod negative for the presence of asbestos, cleanup can proceed as noa-asbcsios project. 4.
ASBESTOS ASBESTOS C<M<C CONC, •nTE ASBCST zs VLCO ZED (itrmXAra^ AWCONC.
Note that there are two layers of asbestos containing tile directly under a significant portion of the hardwood floors (with the exception of the penthouse addition), and that the asbestos will become airborn during
Worker shall mean asbestos handler and/or asbestos handler supervisor, or approved equivalent.
Summary Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Work^: shall mean asbestos handler and/or asbestos handler supervisor, or approved equivalent. 16
Summary Cover sheet for a fax transmission sent from the US EPA Region 2 office in August 2002.
.* * • ' < ■■ Burea «: of Environmental Compliance Asbestos Contractor-Cleaning Procedures for 125 Cedar
Summary Correspondence stating that specific firms are barred from the building due to prior theft and lack of reimbursement.
Safeway Environmental Corp Trio Asbestos Removal Corp. Benjamin Kurzban & Son Control, Inc.
Summary Statistical summary of asbestos testing results submitted by building owners, including counts of bulk tests, PCM air samples, and complaint resolutions.
NYC 9/11 Public Portal Document Department of Environmental Protection Air Monitoring for Asbestos- Indoor Phase I
Summary Memo documenting on-site inspections of buildings near the World Trade Center to assess debris and suspect materials.
have been a-total of 5 WTC complaints for 80 John Street 4 Complaints have been resolved 1 was rec’d on 4/23 and has been forwarded to the Asbestos
Radhakrishnan, Krish Cc: Theodorellys, Penny Subject: 130 Uberty Street - Manhattan On Tuesday 24®’ December, 20021 conducted an inspection along with Supervisor Rasti of PAL (Asbestos
Summary Report on asbestos/HVAC consultant recommendations and planning for metals, mercury, and dioxin testing.
'[email protected]' Cc: Avaltroni, Robert; Radhakrishnan, Krish Subject: Walkthrough Kathy, Just a reminder that the walkthrough with our asbestos
New item: There will be two scope writers, one to address asbestos containing material (ACM) and another to address heating, ventalation and air conditioning systems (HVAC).