Asbestos Project Notification Form, Corona NY — page 6
Summary DEP form notifying the department of an asbestos project at a Corona facility prior to abatement work.
all parties involved In the asbestos project.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary DEP form notifying the department of an asbestos project at a Corona facility prior to abatement work.
all parties involved In the asbestos project.
Summary Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Metals 8 hour sample twice per week Location G Church & Duane St Asbestos 2-12 hour samples daily Contract Location H Chase Manhattan Plaza Asbestos
Summary Formal notification of asbestos abatement activities submitted to the NYC DEP for a Corona site.
of all parties Involved in the asbestos project.
Summary Formal notification of asbestos abatement activities submitted to the NYC DEP for a Corona site.
Independent of all parties involved In the asbestos project.
Summary Laboratory report from Testwell Laboratories presenting air sample results for the facility at 55 Church Street.
The US Environmental Protection Agency (US EPA) definition of Asbestos-Containing material (ACM) is: "Any material, which contain asbestos more than 1% by weight".
Summary Permit application submitted to the NYC DEP regarding asbestos inspection and abatement activities.
NYC 9/11 Public Portal Document ASBESTOS INSPECTION REPORT (continued) 26.
Summary NYC DEP form for asbestos project notification requiring submission to Department of Buildings and DEP with original signatures and copies.
I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the sbestos trol Program Rules
Summary Cover sheet for a facsimile transmission from Pinnacle Environmental Corp., likely regarding 102 North End Avenue.
The contractor must fulfill all revisions to EPA NESHAPS dated November 20, 1990 for the asbestos abatement phase of the project.. 9.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
For asbestos to cause health problems it must be inhaled.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Do these results mean I have been exposed to dangerous levels of asbestos? No. The mere presence of asbestos does not necessarily pose a health concern.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Do these results mean I have been exposed to dangerous levels of asbestos? No. The mere presence of asbestos does not necessarily pose a health concern.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Do these results mean I have been exposed to dangerous levels of asbestos? No. The mere presence of asbestos does not necessarily pose a health concern.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Do these results mean I have been exposed to dangerous levels of asbestos? No. The mere presence of asbestos does not necessarily pose a health concern.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
The mere presence of asbestos does not necessarily pose a health air samples asbestos to cause health problems it must
Summary NYC DEP Asbestos Project Amendment form for modifying a previously filed abatement date.
I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program
Summary Union memorandum discussing the reopening of a closed school following WTC disaster cleanup protocols.
No asbestos structures were detected in 6 of the samples and 1 sample had 1 asbestos structure detected.
Summary NYC DEP Asbestos Project Notification form for an inspection report submission.
I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program R
Summary NYC DEP Asbestos Project Notification form submitted for abatement activities at 48 Chambers Street in Zone III.
NYC 9/11 Public Portal Document ASBESTOS INSPECTION REPORT (continued) 26.
Summary Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Letter reporting asbestos testing results for air and dust at Borough of Manhattan Community College in February 2002.
Asbestos was Laboratory analysis found no asbestos fibers present in 46 of the asbestos concentrations are below the detected