NYC DEP Asbestos Project Notification form submitted for abatement activities at 48 Chambers Street in Zone III.

NYC-WTC_000111508–000111511

Folder label: “Zone III Originals

Page image
Scanned page image, NYC-WTC_000111511
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT (continued)

26. Asbestos Hauler NYS DEC Permit # TEL.# Disposal Site(s)

27 This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) a) 0 Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) 0 Renovation/Alteration e) ❑ Fireproofing Replacement f) 0 Other (Describe) _

28. TYPE OF ABATEMENT (Check all appropriate boxes) ❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up 29. ABATEMENT PROCEDURE (Check all appropriate boxes) ❑ Full Containment ❑ Glovebag ❑ Tent ❑ DEP Variance Application

30. LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) OF FLOOR CONTAINING ACM PERFORMED (e.g. entire, east wing, room p, (e.g. Pipe lagging, ceiling, plenum SQUARE LINEAR (e.g. running cable, installing fire sprinklers, boiler room, lobby, etc) ducts, storage tanks, decking. etc.) FEET FEET removing and replacing boilers, etc.)

oof Item No. 2 3250

31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal. State and NYC laws and regulations applicable to asbestos related work.

arren & Panzer Trio Asbestos Removal NYC Print Name of Air Monitor Print Name of As tos Contractor Print Name of Applicant (If other than Owner)

` Signature Signature Signature

___________ (\i/g/oz.. ___________ Date Date Date

32. I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the sbestos trol Program Rules. I have contracted the third party air monitor who is completely independent of all parties inv v d i th es s . I hereby declare that I have a thorized the filing of this notification for the work specified herein. Time Equities C/o NYC Print Name of Owner Signature f fDate

A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.

Any modification of information provided on this form must be reported immediately in writing directly to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened ACP7 through the performance of work in incremental or piecemeal fashion. 2/2001

NYC-WTC 000111511

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111511Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →