Request for proposals: Architectural services, OEM, 1998 · page 5NYC-WTC_000167849
Solicitation for architectural and engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax: Concerns regarding painting A/V enclosures, Nov 1998 · page 1NYC-WTC_000167862
Correspondence expressing concern about painting A/V enclosure panels at the Mayor's Office of Emergency Management site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Painting metal panels, Nov 1998 · page 1NYC-WTC_000167863
Transmittal regarding painting procedures for metal panels in the field of construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal: OEM project documents, Nov 1998 · page 1NYC-WTC_000167864
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal: OEM project documents, Feb 1998 · page 1NYC-WTC_000167869
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional services authorization: OEM security revisions, Dec 1998 · page 1NYC-WTC_000167870
Authorization for revised scope of architectural, electrical, and security design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Roof shed construction site visit, Dec 1998 · page 1NYC-WTC_000167872
Report on a roof site visit noting items related to roof shed construction for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Drainage and slab replacement drawings, Dec 1998 · page 1NYC-WTC_000167873
Transmittal of additional drain requirements and revised drawings for slab replacement at the loading dock.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: Transformer and panel installation locations, Nov 1998 · page 1NYC-WTC_000167880
Transmittal of revised drawings specifying transformer installation in room 23-05 and panel locations for OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: FSK clarifications and louver shop drawings, Nov 1998 · page 1NYC-WTC_000167881
Transmittal of clarification documents and louver shop drawings for construction use at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: Revised and new FSKs, Nov 1998 · page 1NYC-WTC_000167886
Transmittal of revised and new FSK drawings for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding coat closet design for Mayor's office, Nov 1998 · page 1NYC-WTC_000167892
Correspondence recommending a coat closet location and millwork modifications for the Mayor's suite.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding coat closet design for Mayor's office, Nov 1998 · page 1NYC-WTC_000167893
Correspondence recommending a coat closet location and millwork modifications for the Mayor's suite.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting construction variations for Mayor's suite, Oct 1998 · page 1NYC-WTC_000167896
Official request from OEM Director for specific construction changes to the Commissioner's Suite.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax clarifying floor box locations for telecom, Oct 1998 · page 1NYC-WTC_000167899
Transmission of FSK clarifications regarding raised floor box locations and coordination requirements.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting document distribution for OEM project, Oct 1998 · page 1NYC-WTC_000167909
Letter instructing staff to distribute project documents to various city agencies and consultants.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting drawing revisions for main entrance doors, Sep 1998 · page 1NYC-WTC_000167918
Correspondence regarding requested revisions to main entrance door drawings and package handling.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural elevation showing bullet-resistant package receiver, Oct 1998 · page 1NYC-WTC_000167922
Drawing detail specifying dimensions and specifications for a bullet-resistant package receiver.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project review log, OEM/DCAS, Nov 1997-May 1998 · page 1NYC-WTC_000167943
Log of reviews and diagram submissions for the Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Unreadable document excerpt · page 1NYC-WTC_000167950
Document page containing illegible text or graphics from the Mayor's Office of Emergency Management records.
Citywide Administrative Services, Dept. of · Box 7DCAS
Office of Emergency Management 7 World Trade Center schedule transmittal, · page 1NYC-WTC_000167951
Transmittal cover sheet for Office of Emergency Management schedule under engineering consultant review for 7 World Trade Center, noting schedule is subject to change and…
Citywide Administrative Services, Dept. of · Box 7DCAS
Project schedule excerpt, Office of Emergency Management, Nov 1997-May 1998 · page 1NYC-WTC_000167952
Document page containing a project schedule with tasks and dates for the Office of Emergency Management from late 1997 to mid-1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Labor cost request letter, 7 World Trade Center, December 14 · page 1NYC-WTC_000167962
Letter dated December 14, 1998, requesting reimbursement for additional labor costs due to site delays at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Meeting notes page regarding landlord approval, Sep 1998 · page 1NYC-WTC_000167997
Final page of meeting minutes documenting landlord written approval and distribution list for DCAS recipients.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost summary for OEM furniture items at 7 WTC, Jun · page 2NYC-WTC_000168007
Document listing costs for contract and non-contract furniture items for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Furniture invoice, 7 World Trade Center Floor 23, April 1998 · page 1NYC-WTC_000168031
Invoice for Corcraft steel shelving units supplied by BFI for Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Furniture catalog correspondence, OEM at 7 WTC, June 1998 · page 1NYC-WTC_000168063
Architect provides catalogs for specific non-contract furniture items requested for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM 7 World Trade Center Floor Diagram Revision · page 1NYC-WTC_000168220
Cover letter submitting revised floor diagrams for the Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Space analysis summary sheet for OEM project, Oct 1997 · page 1NYC-WTC_000168310
Summary sheet dated October 20, 1997 detailing space requirements for Mayor's Office of Emergency Management Project 96-1346.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #112, OEM at 7 WTC, February 2000 · page 1NYC-WTC_000168337
Contractor submits Change Order #112 for $2,266 to modify pump suction piping and install a check valve at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo for OEM project, Feb 2000 · page 2NYC-WTC_000168338
Letter dated February 14, 2000 submitting change order #112 for valve replacement work at Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #111, OEM at 7 WTC, February 2000 · page 1NYC-WTC_000168341
Contractor submits Change Order #111 for $17,466 covering sheetrock insulation, painting, and other work on the first, seventh, and twenty-third floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order submission memo, Jan 2000 · page 2NYC-WTC_000168342
Letter from Ambassador Construction submitting change order #111 for insulation, painting, and heater installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #105 Submission, 7 World Trade Center, Nov 1999 · page 2NYC-WTC_000168359
Contractor submission for Change Order #105 regarding audiovisual system expansion and library head end drawings.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #104 for galvanized riser installation, 7 World Trade Center, · page 2NYC-WTC_000168367
Memo submitting invoice #104 for $54,031 to install a 2.5-inch galvanized riser from the loading dock to the telephone frame.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #103 for work on floors 1, 7, and 23, · page 1NYC-WTC_000168369
Memo submitting invoice #103 for $73,987 detailing scope of work performed across the first, seventh, and twenty-third floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #102 for unspecified work on floors 1, 7, and · page 1NYC-WTC_000168371
Memo submitting invoice #102 for $3,854 submitted by a vendor for scope of work on the first, seventh, and twenty-third floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #101 for fire extinguisher installation, 7 World Trade Center, · page 1NYC-WTC_000168372
Memo submitting invoice #101 for $523 to provide and install wall-mounted Halotron 1 fire extinguishers.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #100 for engineering work, 7 World Trade Center, Nov · page 1NYC-WTC_000168374
Memo submitting invoice #100 for $20,625 for engineering work performed by a vendor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #99, OEM at 7 WTC, October 1999 · page 1NYC-WTC_000168375
Contractor submits Change Order #99 for $2,033 to furnish and install separate electrical circuits in executive, coffee, and quad areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #99 Submission, 7 World Trade Center, Oct 1999 · page 1NYC-WTC_000168376
Contractor submission for Change Order #99 to install separate electrical circuits in executive and coffee areas.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #98, OEM at 7 WTC, October 1999 · page 1NYC-WTC_000168377
Contractor submits Change Order #98 for $9,092 to convert press room lights to hard-wired switch legs and eliminate plug-in feeds.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #98 Submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168378
Contractor submission for Change Order #98 to convert press room lights and install louvered fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #97, OEM at 7 WTC, September 1999 · page 1NYC-WTC_000168384
Contractor submits Change Order #97 for $4,560 to enclose oil lines with a two-hour rated sheetrock assembly per architect plans.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #97 submission, 7 World Trade Center, Sept 1999 · page 1NYC-WTC_000168385
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice #096 for heating equipment installation, 7 World Trade Center, · page 1NYC-WTC_000168386
Memo submitting invoice #096 for $10,225 to furnish and install heating equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #096 submission, 7 World Trade Center, Nov 1999 · page 1NYC-WTC_000168387
Letter submitting change order #096 for heat tracing installation on a hot water line in the generator room for $10,225.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #95: Receptacle installation, 7 WTC, Aug 1999 · page 1NYC-WTC_000168388
Memo submitting Change Order #95 for $1,046 to install three new electrical receptacles in the Mayor's conference room at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #95 submission, 7 World Trade Center, Aug 1999 · page 1NYC-WTC_000168389
Letter submitting change order #95 to install three new electrical receptacles under a conference room table for $1,046.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #094, 7 World Trade Center, November 1999 · page 1NYC-WTC_000168390
Change order #094 (revised) for $10,417 to furnish and install automatic air release valve and visual level indicator at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS