Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

I. All demolition and removal work and all other work which may create lead contaminated dust, paint chips or debris shall be performed in accordance with the applicable regulations but not limited to:

1. New York State Department of Environmental Conservation 6NYRR Subparts 371-376

2. Code of Federal Regulations (CFR) Publications:

29 CFR Part 1926.62 Lead Exposure in Construction: Final Rule Vol. 58, No.84

40 CFR 61 Subpart A General Provisions (Hazardous Air Pollutants Listing)

40 CFR 61.152 Standard for Waste Manufacturing, Demolition, Renovation, Spraying and Fabricating Operations

40 CFR 241 Guidelines for the Land Disposal of Solid Waste

40 CFR 257 Criteria for Classification of Solid Waste

40 CFR 261 & 262 Waste Disposal Facilities & Practices

3. American National Standards Institute ANSI Publications

Z88.2-80 Practices for Respiratory Protection

Z87.1 Eye Protection

J. Prior to starting, the Contractor must notify the Commissioner of the Department of Design and Construction if he/she anticipates any difficulty in performing the work as directed and required by these Specifications. The Contractor will be required to attend an on-site job meeting with the Construction Manager, BOE representative, UFT designee and Facility Manager prior to start of work to examine the conditions of the site for removal and plan the sequence for removal operations.

K. The Contractor is responsible for preparing and submitting a new ACP-7 to the Department of Environmental Protection as well as providing all other notifications to various regulatory agencies as required. The Contractor is responsible for preparing, amending and submitting any Asbestos Variances Applications (ACP-9) that may be required for the completion of the Contract or incidental work.

L. For coordination with other Contractors, see the General Conditions governing all Contracts.

M. Noise Control:

1. The Contractor is advised that all work shall be performed in compliance with all applicable provisions of Local Law 57, New York City, Noise Control Code effective September 1, 1972.

02082-7

CITY_21 MCI 00_014563863

NYC-WTC_000455934

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455934Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →