NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 22 pages

Lead based paint removal specifications, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Specifications document for lead-based paint removal at the 130 Cedar Street site.

NYC-WTC_000125675–000125696

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125687
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Lead Based Paint Removal Technical Specifications For 130 Cedar Street New York, NY 10006

1.04 SUBMITTALS: The following items must be submitted by the Contractor to Masterworks Development Corp and/or its selected representative(s) at least two (2) weeks prior to project mobilization:

A. Medical Surveillance:

The contractor shall submit proof of a Medical Surveillance Program for all employees who may be exposed to lead during the course of the work. This program shall comply with 29 CFR Part 1926.62. This includes copies of medical records and blood test results of workers to be utilized on the project, as performed by an occupational physician or medical doctor, and appropriate laboratory.

B. Respiratory Protection Program:

1. The Contractor shall submit for approval a written Respiratory Protection Program for employees throughout all phases of the job, including make, model and National Institute of Occupational Safety & Health (NIOSH) approval number of the respirators to be used, as 29 required by CFR 1926.62 and 29 CFR 1910.134.

2. The Contractor shall submit for approval proof of successful fit testing performed by a qualified individual within the previous six (6) months, for each employee to be used on this project along with the employee's • name and social security number on each record.

C. Training:

The Contractor shall submit certification that the job supervisor/fore- person and each worker has successfully completed a Lead Hazard - Awareness training course in accordance with the 29 CFR Part 1926.62 that includes instruction on the dangers of lead exposure, respirator use, decontamination and applicable regulations.

D. Written Compliance Program:

1. The Contractor shall submit for approval a Written Compliance Program that complies with 29 CFR Part 1926.62.

E. Exposure Assessment:

1. The Contractor shall submit an exposure assessment plan as per OSHA 29 CFR 1926.62 and objective data demonstrating that the demolition operation(s) cannot result in employee exposure to airborne lead at or above the action level. The Contractor shall ensure that workers are not exposed to lead at concentrations greater than the Permissible Exposure Limit (PEL) of 50 micrograms per cubic meter • (ug/cm) over an eight-hour (8) time weighted average (TWA).

2. The Contractor shall provide the name of the individual(s) or firm Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 02085-11

NYC-WTC 000125687

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125687Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →