NYC-WTC_000125675–000125696Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Lead Based Paint Removal Technical Specifications For 130 Cedar Street New York, NY 10006 A. All surfaces shall be maintained free of accumulation of lead dust generated • during demolition activities.
B. If applicable, separate and deposit all lead waste, including sealing tape, plastic sheeting, mop heads, sponges filters, and disposable clothing in double polyethylene bags of at least six (6) mils thick and seal each bag separately.
C. No equipment, supplies or materials (except properly containerized waste materials) shall be removed from the project work area unless such equipment, supplies and/or materials have been cleaned free of lead debris.
1.08 HYGIENE
A. Contractor shall provide hygiene facilities and assure employee compliance with basic hygiene practices. This provision is recognized as an industrial hygiene tool for minimizing additional sources of lead absorption from inhalation or ingestion of lead that accumulates on a worker's hand, face or body. Hand washing facilities are to be provided for all employees occupationally exposed to lead in accordance with 29 CFR 1926.62.
1.09 PERSONAL AIR MONITORING
A. Contractor shall perform representative personal air sampling data as defined within 29 CFR 1926.62. During the first day of demolition of components with coating containing detectable levels of lead, the Contractor shall conduct initial exposure monitoring in order to establish a Time Weighted Average (TWA) exposure. TWA's shall be performed on a representative number of employees who are reasonably expected to have the highest exposure levels for each individual task. Such samples shall be collected within the appropriate breathing zone and used to determine if an upgrade in respirator requirements is needed and to determine the frequency of future air monitoring.
B. Results of the monitoring shall be available in writing within two (2) working days.
NOTE:Prior to receiving Initial air monitoring data, the Contractor shall assume results are at or above the OSHA Permissible Exposure Limit (PEL) and protect employees accordingly.
C. The Contractor shall be responsible for performing personal air monitoring on 25% of the workers that will be exposed to an activity that may potentially produce the highest concentrations of airborne lead.
PART 2- PRODUCTS
2.01 MATERIALS
A. Contractor shall furnish, provide and utilize all tools and equipment necessary to perform the project.
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 02085-13
NYC-WTC 000125689
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000099219
Letter to DEP listing potential contamination questions regarding WTC debris cleanup at 93 Nassau Street.
5 shared non-person entities · 1 shared topics · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156006
Internal communication confirming receipt of Department of Health mold assessment report for 125 Cedar.
7 shared non-person entities · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096827
Document identified only by its archive reference number with no visible text content in the excerpt.
6 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
11 shared non-person entities · 1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096888
Resident request form authorizing DEP to perform cleaning and monitoring work at a Manhattan residence following the attacks.
2 shared non-person entities · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
9 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101360
Automated fax transmission log record dated March 10, 2003 showing successful transmission to NYC DEP.
6 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
9 shared non-person entities · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
8 shared non-person entities · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000095834
Part IV of a permit application dated January 10, 2006 detailing the remediation and management plan for 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096519
Cover page for a remediation and deconstruction plan prepared for the State of New York.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000144916
Large volume technical report containing environmental data and analysis related to the World Trade Center disaster site cleanup.
Cited alongside this record in an Ask answer