Federal project worksheet instructions, FEMA

Machine-extracted title · confidence 58%

FEMA project worksheet guidance for disaster-damage projects and cost thresholds.

NYC-WTC_000454737–000454758
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY PROJECT WORKSHEET INSTRUCTIONS The Project Worksheet must be completed for each identified damaged project. Projects with estimated or actual cost of damage greater than $ 50,600 are large projects. Projects with estimated or actual cost of damage less than $ 50,600 are small projects.

After completing Project Worksheets, submit the worksheets to your Public Assistance Coordinator. Identifying Information Declaration No: Indicate the disaster declaration number as established by FEMA (i.e. "FEMA-1319-DR-WV", etc.). Project No: Indicate the project designation number you established to track the project in your system (i.e. 1,2, 3, etc.) FIPS No: Indicate your FIPS number within this space. This is optional. Date: Indicate the date the worksheet was prepared in MM/DDA'Y format. Category: Indicate the category of the project according to FEMA specified work categories. This is optional. Applicant: Name of the governmental or other legal entity to which the funds will be awarded. County: Name of the county where the damage is located. If located in multiple counties, indicate "Multi-County". Damage Facility: Identify the facility and describe its basic function. Work Complete as of: Indicate the date that the work was examined in the format of MM/DD/YY and the percentage of work completed to that date. Location: This item can range anywhere from an "address", "intersection of..." "1 mile south of...on..." to "county wide". If damages are in different locations or different counties please list each location. Include latitude and longitude of the project if known. Damage Description and Dimensions: Describe the disaster-related damage to the facility, including the cause of the damage and the area or components affected. Scope of Work: List work that has been completed, and work to be completed, which, is necessary to repair disaster-related damage. Include items recorded on the preliminary damage assessment. Does the Scope of Work change the pre-disaster conditions of the site: If the work described under the Scope of Work changes the facilities conditions (I.e. increases/decreases the size or function of the facility or does not replace damaged components in kind with like materials), check yes. If the Scope of Work returns the site to its pre-disaster configuration, capacity and dimensions check no. Special Considerations: If the project includes insurable work, and/or is affected by environmental (NEPA) or historic concerns, check either the Yes or No box so that appropriate action can be initiated to avoid delays in funding. Refer to Applicant Guidelines for further information. Hazard Mitigation: If the pre-disaster conditions at the site can be changed to prevent the disaster-related damage, check Yes. If no opportunities for hazard mitigation exist check No. Appropriate action will be initiated and avoid delays in funding. Refer to Applicant Handbook for further information Is there insurance coverage on this facility: Federal law requires that FEMA be notified of any entitlement for proceeds to repair disaster-related damages, from insurance or any other source. Check Yes if any funding or proceeds can be received for the work within the Scope of Work from any source besides FEMA. Projecl Cost Item: Indicate the item number on the column (i.e. 1,2,3, etc.). Use additional forms as necessary to include all items. Code: If using the FEMA cost codes, place the appropriate number here. Narrative: Indicate the work, material or service that best describes the work (i.e. "force account labor overtime", "42 in. Dia. RCP", "sheet rock replacement", etc.). Quantity/Unit: List the amount of units and the unit of measure ("48/cy", "32/lf", "6/ea", etc.). Unit Price: Indicate the price per unit. Cost: This item can be developed from cost to date, contracts, bids, applicant's experience in that particular repair work, books which lend themselves to work estimates, such as RS Means, or by using cost codes supplied by FEMA. Total Cost: Record total cost of the project. Prepared By: Record the name and title of the person completing the Project Worksheet.__________________________________ Record Requirements Please review Vne Applicant Handbook for detailed instructions and examples. For all completed work, the applicant must keep the following records: * Force account labor documentation sheets identifying the employee, hours worked, date and location; * Force account equipment documentation sheets identifying specific equipment, operator, usage by hour/mile and cost used; * Material documentation sheets identifying the type of material, quantity used and cost; * Copies of all contracts for work and any lease/rental equipment costs. For all estimated work, keep calculations, quantity estimates, pricing information, etc. as part of the records to document the "oost/estimate" for which funding is being requested. FEMA Form 90-91 (BACK), Sep 98

CITY_21MC100_006404316

NYC-WTC_000454737

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454737Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000152508 · Box DEP Box 26

A memorandum outlining the process for gathering documentation to support federal reimbursement requests for disaster recovery.

Similar indexed content

NYC-WTC_000152259 · Box DEP Box 26

A directive regarding monthly equipment usage reports required for federal reimbursement related to World Trade Center recovery.

Similar indexed content

NYC-WTC_000302305

FEMA project worksheet with burden disclosure for NY disaster-1391 activities.

Similar indexed content

Compare copies and versions →