NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

FEMA Project Worksheet, 2001-2002

Machine-extracted title · confidence 28%

FEMA project worksheet with burden disclosure for NY disaster-1391 activities.

NYC-WTC_000302305–000302306
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Damage Description and Scope of Work Continuation Sheet Expires April 30,2001

DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY AMI 061-51 S5E1-51 04/23/01 A APPLICANT COUNTY Department of Transportation New York Scope of Work Continued

Supplies Immediately following the events of September 11, 2001, DOT Division of Arterial Maintenance brought safety supplies to be used by rescue workers at ground zero, digging and cutting tools to remove debris from peripheral areas of ground zero and welding supplies to cut through metal at ground zero. To replenish stocks to their pre-disaster levels. Arterial Maintenance purchased a total of $31,161.36 worth of supplies through 5 invoices.

Eligibility FEMA’s Public Assistance Guide (FEMA 322) page 37 states that, “The cost of supplies that were purchased or taken from an applicant’s stock and used during the performance of eligible work are eligible.” Since the expenses included in this PW are of reasonable price and are directly related connected to the eligible emergency work performed by the DOT, the costs are found eligible.

Documentation A detailed list of materials purchased with exact costs, and invoice number is included as Attachment A. FEMA has reviewed both the quantity and the nature of the supplies and has found them to be both reasonable in scope and of the type that would be heeded. FEMA staff reviewed copies of all of the invoices. The originals are on file with the applicant

DOT Owned Equipment On October 25 and January 11 a Jimmy and a Backup truck were used on each day to repair the chain link fence that protected the public from the activities at the site for a total of $318.84. Immediately following the disaster, DPT maintenance forces were dispatched to clean and sweep the arterials in tlie vicinity of WTC. This work continued from September 12 to 23 using four different kinds of bucks; Sweeper, Van, Back-up Rack, and a D-truck for a total of $4,130.80. DOT was responsible for coordinating the trucks entering and leaving a staging area set up at Warren Street for the heavy equipment used to remove debris from the work zone. Between September 12, 2001 and February 18, 2002 vehicles were used 11 times in this area for a total cost of $2,019.03. Between September 11,2001 and January 6, 2002 Jimmy Vehicles, Vans, Back-up Rack Tmcks, D-Trucks, and FF-Trucks were used on a daily basis to transport materials and supplies around the work zone. DOT also acted as a taxi service to transport emergency personnel around Ore frozen zone for a total of $32,019.32. The total cost for equipment usage was $38,487.99.

Eligibility FEMA’s Public Assistance Policy Digest (FEMA 321) page 46 states, “The costs for using applicant-owned (force account) equipment while conducting eligible work may be claimed on the basis of Equipment Rates.” Since FEMA has determined that the vehicles were used for emergency work, the costs are eligible.

Documentation DOT requested reimbursement using New York State Department of Transportation Equipment Rental Rate Schedule, September 1999 (CHIPS rates). These rates have been used between the state and city on highway projects before. FEMA, NY State, and NYC have reviewed and approved the CHIPS rates. A detailed list showing driver names, title, and vehicle used is included as attachment B. Die Arterial Maintenance group created a work crew sheet for WTC Special/Emergency Work to monitor all activities. All crew sheets list names, hours, vehicles and a description of work done. These crew sheets are on file with the applicant. A selection from 12/30/01 to 1/12/02 were reviewed during the preparation of this PW.

Labor: Overtime Various Arterial Maintenance Personnel drove loads of debris out of the frozen zone and transported recycled asphalt into the frozen zone to create access roads and stabilize the ground to further the recovery efforts between November 9, 2001 until February 2, 2002. Overtime hours spent on this activity cost, $50,727.35. The vehicles used by these personnel belong to the "Street and Arterial Division” and will be requested in an additional PW. Personnel transporting supplies, and emergency personnel around the frozen zone also worked overtime between November 9, 2001 and January 25, 2002 for a total of $21, 533.18. Personnel managing the staging area at Warren Street where heavy equipment was used to remove debris from the work zone worked overtime hours between November 13 and February 18 for a total of $7,457.20. These number includes a 10.73% fringe for a total overtime of $79,717.72. There is a $.01 cent difference due to rounding.

E/igibility FEMA’s Public Assistance Guide page 36, states that, “For debris removal and emergency protective measures, only overtime labor is eligible for permanent employees.” Since FEMA’s has determined that these activities are eligible, overtime labor is eligible.

Documenlation A list of name, title, hours, rate, and fringe is included as attachment C. The above mentioned work crew sheet for WTC SpeciaVEmergency Work were reviewed during the preparation of this PW to verify employee names and hours from 12/30/01 to 1/12/02.

rrtcrrttvcu o t: citiiiy u^iinssmiisun, riujeci ujiiigbi FEMA Form 90-91A, SEP 98

CITY_21MC100_004947597

NYC-WTC_000302306

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302306Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000302302

FEMA project worksheet with burden disclosure for NY disaster work.

Similar indexed content

NYC-WTC_000302277

Paperwork burden disclosure notice for project documentation in FEMA/NY publications.

Similar indexed content

Compare copies and versions →