Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 section Clearance Testing of Work Areas in this Specification.

B. For TEM analysis, the clearance monitoring will be considered satisfactory if conducted in accordance with 40 CFR Part 763, Subpart E, Appendix A - Section IV - Mandatory

C. Interpretation of Transmission Electron Microscopy Results to Determine Completion of Response Actions.

1.29 LOCKDOWN ENCAPSULATION PROCEDURES

The following procedures shall be followed to seal in nonvisible residue while conducting lockdown encapsulation on all surfaces from which ACM removed:

a. Only encapsulants rated as acceptable or marginally acceptable on the basis of Battelle Columbus Laboratory test procedures and rating requirements developed under the 1978 USEPA Contract shall be used for lockdown encapsulation.

b. The encapsulant solvent or vehicle shall not contain a volatile hydrocarbon unless reviewed and approved by DEP.

c. Latex paint with solids content greater than 15 percent shall be considered a lockdown sealant for coating all non-metallic surfaces.

d. Encapsulants shall be applied using airless spray equipment. Spraying is to occur at the lowest pressure range possible to minimize fiber release from encapsulant impact at the surface. It shall be applied with a consistent horizontal or vertical motion.

1.30 CLEARANCE TESTING OF WORK AREAS

A, Clearance Procedure for Areas Prepared Utilizing Full Containment Enclosure:

1. Clearance Procedure for Areas Prepared Utilizing Full Enclosure:

a) Cleaning of the work areas and other contaminated areas shall be conducted in accordance with procedure described below:

Step 1. Clean-up Visual Inspection Step 2. Final Visual Inspection and fiber reoccupancy clearance count of <0.01 fiber/cc of air using NIOSH Method 7400 and less than 70 structures per mm^ when using Transmission Electron Microscopy.

b) Area air samples will be collected prior, during and after abatement according to established air clearance criteria per New York City Title 15.

c) To determine final air clearance reoccupancy, the following air samples shall be

02082-43

CITY_21 MCI 00_014563816

NYC-WTC_000454616

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454616Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →