Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
The use of materials of known purity and quality will be utilized for the calibration of
all instruments as part of this project. The laboratories will carefully monitor the use of
all laboratory materials including solutions, standards and reagents through well
documented procedures. All solid chemicals and acids/bases used by the laboratories will
be reagent grade or better. All gases will be high purity or better. All standards or
standard solutions will be obtained from U.S. Environmental Protection Agency certified
commercial sources. All materials including standards or standard solutions will be dated
upon receipt, and will be identified by material name, lot number, purity or concentration,
supplier, receipt/preparation date, recipient/preparer’s name, and expiration
date. Standards or standard solution concentrations will be validated prior to use. This
validation may be restandardized for acids and bases, response factor comparison,
standard curve response, comparison to other standards made at a different time and/or by
a different analyst. All standards and standard materials will be checked for signs of
deterioration including unusual volume changes (solvent loss), discoloration, formation
of precipitates or changes in analyte response. All standards and standard solutions will
be properly stored and handled and will be labeled with all appropriate information
including compound/solution name, concentration, solvent, expiration date, preparation
date, and the initials of the preparer. All solvent materials or materials used as part of a
given procedure will also be checked. Each new lot of solvent will be analyzed to ensure
the absence of interference.
14.0 DATA MANAGEMENT
14.1 Sample Collection Documentation
This section of the QAPP describes field documentation procedures that will be followed
for this project. Records of field data will be made throughout the project to document
critical data that might be needed at a later time, such as during preparation of the report,
or for use by other investigators who were not present when the data were collected. Field
data will be recorded on the following logs, forms, and/or notebooks.
• Daily Personnel Log
• Field Notebooks
• Field Data Forms
• Photographs
• Equipment Calibration Logs
• Health and Safety Logs
The AIRTEK Field Sampling Coordinator has the responsibility to maintain the various
logs, forms, and notebooks that document daily field activities as discussed below.
Individual responsibilities will be delegated to other field staff as appropriate. Special
emphasis will be placed on the completeness and accuracy of all information recorded in
the field, and will contain statements that are legible, accurate, and inclusive
documentation of project activities. Because the logbooks, field data forms, and chain-of-