Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
custody forms provide the basis for future reports, they must contain accurate facts and
observations. The language used in recording all field data will be objective, factual, and
free of personal interpretations or other terminology that may prove inappropriate. In
general, field forms will be used to record most of the daily field information
including calibrations, start and stop times of pumps, sample volumes, equipment
inspections, etc. These forms will be filed in the on-site trailer/office. The following
sections describe how data collected in the field will be documented, tracked, and
controlled.
14.1.1 Daily Personnel Log
A log may be maintained in the field trailer to record the identities of all personnel who
are onsite for the duration of the project. A sign will be posted at the entrance to the site
indicating that all visitors and contractors must sign-in at the field trailer. The log will
record the following information.
• Names of field personnel • Names of subcontractor personnel
• Names of visitors
• Affiliation of each person on-site
• Time of entry and exit.
14.1.2 Field Logbooks
Field logbooks will provide the means of recording the chronology of data collection
activities performed during the investigation. As such, entries will be described in as
much detail as possible so that a particular situation could be reconstructed without
reliance on memory. Field logbooks will be bound field survey books or notebooks.
Logbooks will be assigned to field personnel, but will be stored in the project files when
not in use. Each logbook will be identified by the project-specific document number. All
logbooks will be water resistant and have sequentially numbered pages. The title page of
each logbook will contain the following:
• Person to whom the logbook is assigned,
• The logbook number,
• Project name and number,
• Site name and location,
• Site location by longitude and latitude, if known,
• Project start date, and
• End date.
Entries into the logbook will contain a variety of information. At the beginning of each
entry, the date, start time, weather, and names of all sampling team members present will
be entered. Each page of the logbook will be signed and dated by the person making the
entry. All entries will be made in permanent ink, signed, and dated and no erasures or
obliterations will be made. If an incorrect entry is made, the information will be crossed
out with a single strike mark which is signed and dated by the sampler. The correction