fracturing from excavation blasting often necessitate the removal
(scaling) of loose material beyond the designed face and placement of
an additional amount of concrete. In addition, blast damage to the final
rock face may cause instability and rockfall hazards. For these rea
sons, among others, controlled blasting is indispensably routine in
excavation for structures and elsewhere. Controlled-blasting tech
niques minimize overbreakage and permit steeper slope designs because
of increased mechanical stability and resistance to weathering. They
also reduce deeper fracturing and weakening of the finished excavation.
The techniques can be used to cut an excavation to accurate lines and
around vertical and horizontal corners. Improved appearance of rock
slopes may also result. Three controlled-blasting techniques in use
today are presplitting (Fig. 5-17), smooth blasting, and line drilling.
a. Presplitting. A presplit surface is initiated along the exca
vation line by blasting instantaneously a single row of closely spaced
drill holes prior to detonating the main rounds. The presplit surface
reduces enough of the blast effects of the main round to reduce damage
in the rock beyond it. Ideally a single fracture connects adjacent
blastholes (Fig. 5-18), and half of the hole (cast) remains at each pre
split hole. Excessive crushing and radial cracking at the periphery or
between holes are indications that the charges should be reduced.
Supplemental adjustment of hole spacing may also be necessary.
Formation of the presplit fracture is influenced by borehole spacing,
with the closer spacing forming a more prominent fracture. Because
of the high cost of drilling, the optimum spacing is the largest at which
radial cracks will join and form a continuous undamaged surface.
(1) Design of the Presplitting L/ayout.
(a) Critical factors in successful presplitting, other than exca
vation slope design, are hole diameter and spacing, hole deviation,
charge distribution, and confinement. Preblast field testing may help
to deterrhine optima for each job. Competent and homogeneous rock
usually permits greater spacing, while the hole diameter is usually
smaller in hard rock than in soft (para 6-2). Presplitting holes usu
ally are double loaded at the bottom to insure splitting to the full depth,
but some blasters question the value of heavier bottom loads.
(b) Review of data from 35 successful presplitting operations
indicates that a spacing of 24 in., center to center, and a hole diameter
of 3 in. were used most often (Table 5-2). Charges were usually
1-1/4- by 4-in. half-cartridges of 40 percent gelatin or ammonia
gelatin dynamite taped at 1-ft intervals (intervals as much as 3 ft have
been used) to down lines of detonating cord with one or two 1-1/4- or
1-1/2- by 8-in. sticks at the bottom. This amounts to about 1/4 lb
5-15