WTC Tremolite fiber monitoring, 2000

Machine-extracted title · confidence 41%

Coordination and monitoring for asbestos-related Tremolite fiber sampling.

NYC-WTC_000435232–000435267
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EPA R8 Multimedia Asbestos Sampling: Libby,MT January 4, 2000

because indirect preparation steps may alter fiber morphology and/or may alter fiber recovery, indirect sampling will be avoided whenever possible.

B5 QUALITY CONTROL REQUIREMENT

The project team organization ensures attainment of QA objectives by:

C Assigning responsibility for performing work according to specifications

C Providing oversight of quality-related activities for verification of conformance with specifications

C Defining the relationships between management and personnel performing quality-related work Corrective Action

The Project Manager will prepare a summary of quality-related activities and problems. This summary will be forwarded to EPA for inclusion in the project file. If deficiencies in the program are identified, the Project Manager will identify recommendations for corrective action.

Communications. Lines of communication between project personnel and project management staff will be appropriate to enable timely response to events that have the potential to affect data quality. Project personnel will be provided with a project contact list that includes telephone numbers for both routine communications and emergency notifications.

Communications will also entail ensuring that information on sample collection, transportation, analysis, and storage; data acquisition, analysis, and reporting; personnel assignments and activities; and other information pertinent to the project are distributed to potentially affected personnel in a timely manner. Changes in procedures, equipment, personnel, or other program elements as a result of an accident or emergency that have the potential to affect data quality or achievement of overall program objectives will be communicated to the Project Manager in writing in a timely manner. Copies of all written communications and written summaries of all substantive telephone conversations will be placed in a permanent project file maintained by the EPA Qn Scene Coordinator.

Quality Control Methods. Quality control methods will include both a field and laboratory component. Field personnel will prepare two types of quality control samples: replicates and blanks.

Replicates - For air samples, replicates are defined as separate samples that are collected using separate air pumps and filters. These air samples are collected side-by-side at a location and are sampled for the same amount of time. Air pumps are set at the same air flow rates so that adequate and like air volumes are passed through each filter. Replicate samples will not be collected for any media other than air.

23

CITY_21MC100_009479274

NYC-WTC_000435257

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435257Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →