NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

NYC-WTC_000234840

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000234840–000234848
Page image
Scanned page image, NYC-WTC_000234841
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2

Any environmental data collected for the agency must comply with EPA Order 5360.1 CHG 2, Policy and Program Requirements for the Mandatory Agency -wide Quality System. This document provides the requirements for the conduct of quality management practices, including Quality Assurance (QA) and Quality Control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

The contractor shall submit to the PO a Quality Assurance Project Plan (QAPP) and a Health and Safety Plan for this project. The contractor shall use the EPA Requirements For Quality Assurance Project Plans EPA QA/R-5. (EPA/240/B-01 /003) March 2001 for the development of this QAPP.

TASK 2: Field Implementation Support:

The contractor shall perform all field activities utilizing the appropriate field sampling and analytical methods specified in Attachment 2.

$ The contractor shall ensure that all personnel performing work under this task have received appropriate training.

$ The contractor shall provide the sampling equipment necessary to perform the sampling outlined in this contract. Any purchased equipment will be returned to EPA at the conclusion of this contract.

$ The contractor personnel shall be required to have the proper site Personal Protective Equipment (PPE) for performing the work.

$ The contractor shall provide the supplies and consumables necessary to perform the sampling (e.g. sample wipes, filters etc.) and store them appropriately until use.

$ The contractor shall transport portable air, microvac, and wipe sampling devices to sample locations, assemble the instruments, program the instruments, perform verifications (calibration when necessary), install filters and operate the instrument to begin the sampling. The contractor shall document all the necessary information regarding sampling activities, fill out all field logs, data sheets and chain of custody forms. The contractor shall use FQRMS II lite for all sample and chain of custody documentation. The contractor shall remain at each site for the entire sampling event. Upon completion of the sampling event the contractor shall retrieve any stored information and/or data and record any additional required field information. The contractor shall remove and properly package and store the sample filter for transport, and disassemble the sampling instruments. The contractor shall properly package the samples for shipment/transport to the EPA Regional contract laboratory specified on chain-of-custody forms. The contractor will provide the appropriate electronic data and hard copy data forms to the on-site EPA representative daily.

$ The contractor will visit o total of fourteen (14) buildings for this project.

$ Fourteen (14) buildings will be sampled according to the table provided in Attachment 1.

CITY_21MC100_008824773

NYC-WTC_000234841

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000234841Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →