Any environmental data collected for the agency must comply with EPA Order 5360.1 CHG 2, Policy and Program Requirements for the Mandatory Agency -wide Quality System. This document provides the requirements for the conduct of quality management practices, including Quality Assurance (QA) and Quality Control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.
The contractor shall submit to the PO a Quality Assurance Project Plan (QAPP) and a Health and Safety Plan for this project. The contractor shall use the EPA Requirements For Quality Assurance Project Plans EPA QA/R-5. (EPA/240/B-01 /003) March 2001 for the development of this QAPP.
TASK 2: Field Implementation Support:
The contractor shall perform all field activities utilizing the appropriate field sampling and analytical methods specified in Attachment 2.
$ The contractor shall ensure that all personnel performing work under this task have received appropriate training.
$ The contractor shall provide the sampling equipment necessary to perform the sampling outlined in this contract. Any purchased equipment will be returned to EPA at the conclusion of this contract.
$ The contractor personnel shall be required to have the proper site Personal Protective Equipment (PPE) for performing the work.
$ The contractor shall provide the supplies and consumables necessary to perform the sampling (e.g. sample wipes, filters etc.) and store them appropriately until use.
$ The contractor shall transport portable air, microvac, and wipe sampling devices to sample locations, assemble the instruments, program the instruments, perform verifications (calibration when necessary), install filters and operate the instrument to begin the sampling. The contractor shall document all the necessary information regarding sampling activities, fill out all field logs, data sheets and chain of custody forms. The contractor shall use FQRMS II lite for all sample and chain of custody documentation. The contractor shall remain at each site for the entire sampling event. Upon completion of the sampling event the contractor shall retrieve any stored information and/or data and record any additional required field information. The contractor shall remove and properly package and store the sample filter for transport, and disassemble the sampling instruments. The contractor shall properly package the samples for shipment/transport to the EPA Regional contract laboratory specified on chain-of-custody forms. The contractor will provide the appropriate electronic data and hard copy data forms to the on-site EPA representative daily.
$ The contractor will visit o total of fourteen (14) buildings for this project.
$ Fourteen (14) buildings will be sampled according to the table provided in Attachment 1.
CITY_21MC100_008757578
NYC-WTC_000234800
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000178137
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
12 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000176016
Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.
11 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
13 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182053
Contract document outlining the scope for collecting and analyzing settled and airborne dust samples from buildings affected by Ground Zero dust.
13 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162212
EPA staff distributed a chain of custody document to multiple federal and city agencies on May 15, 2002.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178163
Contractual document outlining services to collect and analyze dust samples for hazardous substances in selected New York City buildings.
12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178137
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000178137
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similar indexed content
NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similar indexed content
Similar indexed content
Similar indexed content