NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

NYC-WTC_000199865

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000199865–000199873
Page image
Scanned page image, NYC-WTC_000199866
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2

Program Requirements for the Mandatory Agency -wide Quality System. This document provides the requirements for the conduct of quality management practices, including Quality Assurance (QA) and Quality Control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

The contractor shall submit to the PO a Quality Assurance: Project Plan (QAPP) and a Health and Safety Pion for this project. The contractor shall use the EPA Requirements For Quality Assurance Project Plans EPAQA/R-5, (EPA/240/B-01/003) March 2001 for the development of this QAPP.

TASK 2: Field Implementation Support:

The contractor shall perform all field activities utilizing the appropriate field sampling and analytical methods specified in Attachment 2.

The contractor shall ensure that all pe’-sonnel performing work under this task have received appropriate training.

The contractor shall provide the sampling equipment necessary to perform the sampling outlined in this contract. Ary purchased equipment will be returned to EPA at the conclusion of this contract.

The contractor personnel shall be requireo to have the proper site Personal Protective Equipment (PPE) for performing the work.

The contractor shall provide the supplies and consumables necessary to perform the sampling (e.g. sample wipes, filters etc.) and store them appropriately until use.

The contractor shall transport portable; air, microvac, and wipe sampling devices to sample locations, assemble the ins Tuments, program the instruments, perform verifications (calibration when necessary), install filters and operate the instrument to begin the sampling. The contractor shell document all the necessary information regarding sampling activities, till out all field logs, data sheets and chain of custody forms. The contractor shall use FORMS II lite for all sample and chain of custody documentation. The contractor shall remain at each site for the entire sampling event. Upon complet on of the sampling event the contractor shall retrieve any stored information and/cr data and record any additional required field information. The contractor shall remove and properly pockage and store the sample filter for transport, and disassemble the sampling instruments. The contractor shall prooerly package the samples for shipment/transport to the EPA Regional contract laboratory specified on chain-of-custody forms. The contraefor will provide the appropriate electronic data and hard copy data forms to the on-site EPA representative daily.

The contractor will visit a total of fourt€;en (14) buildings for this project.

Fourteen (14) buildings will be sampled according to the table provided in Attachment 1. For each building, three units (2 residences and 1 common area) will be sampled.

CITY_21MC100_003052783

NYC-WTC_000199866

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000199866Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →