Quality Control (QC) activitieswr a oniwnta col^cl ivWnmental technology
programs performed by or for Bis Ai
The contractor shall submit to the PO a Quality Assurance Project Plan (QAPP) and a Health and
Safety Plan for this project. The contractor shall use the EPA Requirements For Quality Assurance
Project Plans EPA QA/R-5. (EPA/240/B-01 /003) March 2001 for the development of this QAPP.
TASK 2: Field Implementation Support:
The contractor shall perform all field activities utilizing the appropriate field sampling and
analytical methods specified in Attachment 2.
The contractor shall ensure that all personnel performing work under this task
have received appropriate training.
The contractor shall provide the sampling equipment necessary to perform the
sampling outlined in this contract. Any purchased equipment will be returned to
EPA at the conclusion of this contract.
The contractor personnel shall be required to have the proper site Personal
Protective Equipment (PPE) for performing the work.
The contractor shall provide the supplies and consumables necessary to perform
the sampling (e.g. sample wipes, filters etc.) and store them appropriately until
use.
The contractor shall transport portable air, microvac, and wipe sampling devices
to sample locations, assemble the instruments, program the instruments, perform
verifications (calibration when necessary), install filters and operate the
instrument to begin the sampling. The contractor shall document all the
necessary information regarding sampling activities, fill out all field logs, data
sheets and chain cf custody forms. The contractor shall use EORMS II lite for all
sample and chain of custody documentation. The contractor shall remain at
each site for the entire sampling event. Upon completion of the sampling event
the contractor shall retrieve any stored information and/or data and record any
additional required field information. The contractor shall remove and properly
package and store the sample filter for transport, and disassemble the sampling
instruments. The contractor shall properly package the samples for
shipment/transport to the EPA Regional contract laboratory specified on
chain-of-custody forms. The contractor will provide the appropriate electronic
data and hard copy data forms to the on-site EPA representative daily.
The contractor will visit a total of fourteen (14) buildings for this project.
Eourteen (14) buildings will be sampled according to the table provided in
Attachment 1.
Eor each building, three units (2 residences and 1 common area) will be
sampled.