The contractor shall submit* Health and
Safety Plan for this project. le cwtr ihaIR I"■an
the For Quality Assurance
Project Plans EPA QA/R-5, (I ir the envelopment of this QAPP.
MF db
TASK 2: Field Implementation Support:
The contractor shall perform all field activities utilizing the appropriate field sampling and
analytical methods specified in Attachment 2.
The contractor shall ensure that all personnel performing work under this task
have received appropriate training.
The contractor shall provide the sampling equipment necessary to perform the
sampling outlined in this contract. Any purchased equipment will be returned to
EPA at the conclusion of this contract.
The contractor personnel shall be required to have the proper site Personal
Protective Equipment (PPE) for performing the work.
The contractor shall provide the supplies and consumables necessary to perform
the sampling (e.g. sample wipes, filters etc.) and store them appropriately until
use.
The contrador shall transport portable air, microvac, and wipe sampling devices
to sample locations, assemble the instruments, program the instruments, perform
verifications [calibration when necessary), install filters and operate the instrument
to begin the sampling. The contractor shall document all the necessary
information regarding sampling activities, fill out all field logs, data sheets and
chain of custody forms. The contractor shall use FORMS II lite for all sample and
chain of custody documentation. The contractor shall remain at each site for the
entire sampling event. Upon completion of the sampling event the contractor
shall retrieve any stored information and/or data and record any additional
required field information. The contractor shall remove and properly package
and store the sample filter for transport, and disassemble the sampling
instruments. The contractor shall properly package the samples for
shipment/transport to the EPA Regional contract laborotory specified on
chain-of-custody forms. The contractor will provide the appropriate electronic
data and hard copy data forms to the on-site EPA representative daily.
The contractor will visit a total of fourteen (14) buildings tor this project.
Fourteen (14) buildings will be sampled according to the table provided in
Attachment 1.
For each building, three units (2 residences and 1 common area) will be
sampled.
All work shall be completed in accordance with the Statement of Work, QAPP and all
referenced sampling methods, analytical methods, SOPs and guidance attached to the QAPP.
No deviations from the Statement of Work, QAPP or SOPs including referenced methods,
CITY_21MC100_003112718