GENERAL EXCEPTIONS; R£; ALL WORK REQUIRING STREET EXCAVATIONS
Due to the possibility of underground utilities, existing water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined " NOT SUITABLE FOR BACKFILL" by the NACDOT or NYCDEP and furnishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilities and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for these utilities to be relocated by their forces, or by o'ur forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required 'will be performed by our forces and paid for on a time and materials basis or anotlier method acceptable to both parties.
In the event a change order is required and can not be negotiated ai the time it is discovered and we are ^^required to close up any excavations, there ■will be an additional charge for remobilizahon of our ^Pforces w'hen an agreed change order has been signed both parlies.Please be aware the job will not continue until the additional work authorization is signed.
Contractor. JCC COESTKUCnON CORPORATION Contractor Signature: David Cannizzaro Print Name & Title: David Cannizzaro.Trcsidcm Date:
Agreed & Accepted by: Pnnt Name & Title: Date:
12.003257
CITY_21MC100_001162935 NYC-WTC_000432244
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
1 shared topics · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356980
Bid to perform materials and labor for listed World Trade Center works.
1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251953
Alternate proposal for WTC Recovery including sand removal and site improvements.
1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267052
JCC Construction Corp. proposal to perform specified site work for World Trade Center Recovery.
1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290803
Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.
1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386478
Project work order for World Trade Center water analyses and related tasks.
1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000205169
Proposal from JCC Construction Corp to remove and replace sand in the World Trade Center recovery site playground area dated May 2002.
1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356811
Proposal to perform site work: sand, soil, railing, and roadway work at WTC site.
1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000251953
Alternate proposal for WTC Recovery including sand removal and site improvements.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356811
Proposal to perform site work: sand, soil, railing, and roadway work at WTC site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251944
Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000205169
Proposal from JCC Construction Corp to remove and replace sand in the World Trade Center recovery site playground area dated May 2002.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similar indexed content
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similar indexed content
NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
Similar indexed content
NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
Similar indexed content
NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
Similar indexed content