Ambient Air Monitoring Program Section No. 13
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 89 of 116
• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent
back to the manufacturer annually for recalibration. Also, if any visual inspection reveals
new defects in the device, then it should be sent back to the manufacturer for recalibration.
• Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three
(3) points must be performed before first use and quarterly thereafter. Additionally, the
sampler should be calibrated after any repairs that might affect calibration; after relocation of
the sampler to a different site; or if the results of a field QC flow check exceed ±10% of the
samplers indicated flow rate.
PMio and PM ys Using a Met One E-BAM Continuous Monitor
Calibration verification is performed using two calibration plates that represent a Zero and Span
factory set calibration points. Check that the serial number on calibration plates matches the
serial number of the E-BAM to be calibrated. If Zero or Span tests fail, re-run the test. If failure
continues, clean the detector and re-run the test. If failure persists, contact the manufacturer.
13.2.2 Analytical Laboratory Equipment
Table 13-4 details the calibration procedures associated with all fixed laboratory instruments.
These calibration procedures ensure that the analytical methods and selected instrumentation
meet project requirements for selectivity, sensitivity, accuracy and precision of quantitation.
These calibration procedures are also discussed in the individual methods.
13.3 Inspection/Acceptance of Supplies and Consumables
13.3.1 Field Supplies/Consumables
Critical supplies and sample containers will be inspected in the following manner.
Critical Supplies and Inspection Requirements Responsible
Consumables and Acceptance Criteria Individual
Sample bottles, media Visually inspected upon receipt for cracks, breakage, Field Sampling
cleanliness. Must be accompanied by certificate of analysis. Coordinator
Chemicals and reagents Visually inspected for proper labeling, expiration dates, Field Sampling
appropriate grade Coordinator
Record lot numbers of reagents used for calibration.
Supplies and consumables not meeting acceptance criteria will initiate the appropriate corrective
action. Corrective measures may include notification of vendor and subsequent replacement of
defective or inappropriate materials. All actions will be documented in the project files.
L2005-346 Rev. 1