NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
NYC-WTC_000449648–000449764OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 1 .iberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 89 of 116
• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration.
• Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed ±10% of the samplers indicated flow rate.
PMio and PM^s Using a Met One E-BAM Continuous Monitor
Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates matches the serial number of the E-BAM to be calibrated. If Zero or Span tests fail, re-run the test. If failure continues, clean the detector and re-run the test. If failure persists, contact the manufacturer.
13.2.2 Analytical Laboratory Equipment
Table 13-4 details the calibration procedures associated with all fixed laboratory instruments. These calibration procedures ensure that the analytical methods and selected instrumentation meet project requirements for selectivity, sensitivity, accuracy and precision of quantitation. These calibration procedures are also discussed in the individual methods.
13.3 Inspection/Acceptance of Supplies and Consumables
13.3.1 Field Supplies/Consumables
Critical supplies and sample containers will be inspected in the following manner.
Critical Supplies and Inspection Requirements Responsible Consumables and Acceptance Criteria Individual Sample bottles, media Visually inspected upon receipt for cracks, breakage, Field Sampling cleanliness. Must be accompanied by certificate of analysis. Coordinator Chemicals and reagents Visually inspected for proper labeling, expiration dates, Field Sampling appropriate grade Coordinator Record lot numbers of reagents used for calibration.
Supplies and consumables not meeting acceptance criteria will initiate the appropriate corrective action. Corrective measures may include notification of vendor and subsequent replacement of defective or inappropriate materials. All actions will be documented in the project files.
L2005-346 Rev. 1
CITY_21MC100_003239382
NYC-WTC_000449737
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
76 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451195
QA plan for environmental air monitoring and waste management at NYC sites.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427900
Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423885
Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similar indexed content
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
Similar indexed content
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similar indexed content