Ambient Air Monitoring Program Section No. 13
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 84 of 116
PMm and PM? s Using a Reference Sampler
Tables 13-Id summarizes major maintenance activities for the PMio and PM2.5 samplers. The
manufacturer’s documentation should be consulted for a more exhaustive list of maintenance and
inspection procedures.
Table 13-ld, Maintenance, Testing, and Inspection Requirement for the
Anderson RAAS Sampler Used for PM m and PM2.5
Acceptance
Equipment Frequency/Method Corrective Action
Criteria
Sampler Dismantle and clean al No obvious Clean or replace
inlet/receiver tube manufacturer specified particulate deposits or damaged equipment
intervals damage before sampling
Power cords Check for crimps or No obvious damage Replace as necessary
cracks
O-Rings At 3 month intervals, No leaks or Replace as necessary
inspect all 0-rings in the compression damage
sampler evident
Tubing and fittings Visually inspect on No crimps, cracks, or Replace as necessary
sample recovery days obstructions; no
crossthreading
Vacuum pump Replace diaphragm of NA NA
vacuum pump annually
• Field QC Flow Check - The field technicians should perform a single point flow check at the
normal operating flow rate on a monthly basis. If the results of the field flow check exceed
+10% of the flow rate indicated by the sampler, the sampler should be serviced (if necessary)
and a new, full multipoint calibration should be performed.
• Leak Check - The filter used in the sampler is contained within a cassette. A daily leak
check is necessary to demonstrate that the portion of the sample flow rate that leaks past the
filter without passing through the filter is insignificant relative to the design flow rate of the
sampler. The leak check should be performed at 55 mm Hg vacuum or better. Record the
initial vacuum. After ten (10) minutes record the final vacuum. Consult the manufacturer’s
documentation to find the acceptable criteria for the difference between the initial and final
vacuums. This criteria is sampler dependent as it must take into account the internal volume
of the sampler under vacuum.
PMi 0 andJ^Mi 5 Using a Met One E-BAM Continuous Monitor
Maintenance, testing, and inspection requirements for the E-BAM continuous monitors are as
follows.
• Audit flow system periodically by performing leak checks and flow audits.
L2005-346 Rev. 1