NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 13
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 85 of 116
• Clean nozzle periodically.
• Service pump annually or more often as needed.
• Check the measurement system with the Zero and Span plates quarterly.
• Clean dust off of detector-sensing region quarterly during calibration audit.
13.1.2 Analytical Laboratory Equipment
This section describes the procedures and documentation activities that will be performed to
ensure that all fixed laboratory instrumentation and equipment are available and in good working
order when needed. Table 13-2 details the fixed laboratory instrument maintenance, testing, and
inspection requirements. Equipment maintenance logs must be kept and equipment must be
checked prior to use.
Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed
__________ Laboratory Analyses_______________________________
Param eter/In strum ent _______________ Maintenance, Testing, and Inspection Activities_______________
Metals/lCP/MS Clean nebulizer, check pump tubing, replace disposables, check torch alignment, clean
spray chamber.
Inspect waste and rinse water container levels.
Inspect roughing pump oil level and color.
Remove and wipe down interface cones (replace as necessary).
Inspect the injector and support adapter for cleanliness.
Check the peristaltic pump tubing for wear and replace as necessary.
PAHs/GC/MS Check connections.
Replace disposables.
Perform injection port maintenance.
Clip column.
Perform leak checks.
Clean detector._____________________________________________________________
PCBs/GC/ECD Check connections.
Replace disposables.
Perform injection port maintenance.
Clip column.
Perform leak checks.
Clean detector._____________________________________________________________
Dioxins & Furans/HRGC/ Check connections.
HRMS Replace disposables.
Perform injection port maintenance.
Clip column.
Perform leak checks.
Clean detector._____________________________________________________________
Asbestos/TEM Align and check TEM scope. Calibrate for AFCu EDX response daily._____________
Silica/XRD Check daily for Si-primary peak, displacement, and detector resolution._____________
Mercury/CVAFS Check fittings, rinse and refill DDIW bottle, prepare new pretraps, blank each
analytical trap.
Soak bubblers in 1% KOH solution.
Change traps, replace lamps, clean/charge quartz cell.
Inspect tubing, replace fittings, prepare new stock standards.
L2005-346 Rev. 1
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114726
NYC-WTC_000428409
OCR can misread numbers and units. Confirm readings against the page image before using them.