NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Ambient Air QA Plan, LMDC Deconstruction, Aug 2005

Machine-extracted title · confidence 43%

Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).

NYC-WTC_000428324–000428440
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 6 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 23 of 116

6.3.1 Decisions Based on Project Action Levels

The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern.

6.3.2 Target Air Quality Levels

6.3.2.1 Definitions of Exceedances

Any 24-hour PM2.5 and PAL, value in excess of the Target Air Quality Level will be considered an “exceedance” and the actions described below will be taken.

During the first week of sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific Trigger Level, will be considered an exceedance and the actions described below will be taken.

Pollowing the first week of sampling, a cumulative average will be established based initially on the first week’s results, to which will be added daily values as results are received from the laboratory. A cumulative average value for any analyte other than PM2 5 and PMio, in excess of the relevant Target Air Quality Level will be considered an exceedance and the actions described below will be taken.

6.3.2.2 Actions Based on Exceedances

Exceedance at any of the twelve (12) monitoring locations will be handled as set forth in the August 2005 Air Monitoring Plan.

Exceedances in any of the four (4) off-site elevated monitoring locations that do not coincide with exceedances in any of the eight (8) on-site air monitoring locations for the same parameter will result in an evaluation of engineering controls and work techniques in the Building. This evaluation shall determine whether: (i) negative pressure is being maintained in active work areas at the required levels (ii) there are breaches in the containment in active work areas, and (iii) there ai’e any visible emissions from the containment areas. If none of the above problems are identified, an off-site/regional source will be deemed the cause of the exceedance and deconstruction activities will not be stopped.

L2005-346 Rev. 1

CITY_DEP_WORBY_CANNATA_SUBP_000114664

NYC-WTC_000428347

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000428347Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000427221

Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.

Similar indexed content

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000421577

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →