Ambient Air Monitoring Program Section No. 6
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 23 of 116
6.3.1 Decisions Based on Project Action Levels
The following actions will be taken if there is an exceedance of any Target Air Quality Level. If
there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger
Level, actions associated with the USEPA Site Specific Trigger Level will govern.
6.3.2 Target Air Quality Levels
6.3.2.1 Definitions of Exceedances
Any 24-hour PM2.5 and PAL, value in excess of the Target Air Quality Level will be considered
an “exceedance” and the actions described below will be taken.
During the first week of sampling, any sample of an analyte, other than PM2.5 and PMio, in
excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA
Site Specific Trigger Level, will be considered an exceedance and the actions described below
will be taken.
Pollowing the first week of sampling, a cumulative average will be established based initially on
the first week’s results, to which will be added daily values as results are received from the
laboratory. A cumulative average value for any analyte other than PM2 5 and PMio, in excess of
the relevant Target Air Quality Level will be considered an exceedance and the actions described
below will be taken.
6.3.2.2 Actions Based on Exceedances
Exceedance at any of the twelve (12) monitoring locations will be handled as set forth in the
August 2005 Air Monitoring Plan.
Exceedances in any of the four (4) off-site elevated monitoring locations that do not coincide
with exceedances in any of the eight (8) on-site air monitoring locations for the same parameter
will result in an evaluation of engineering controls and work techniques in the Building. This
evaluation shall determine whether: (i) negative pressure is being maintained in active work
areas at the required levels (ii) there are breaches in the containment in active work areas, and
(iii) there ai’e any visible emissions from the containment areas. If none of the above problems
are identified, an off-site/regional source will be deemed the cause of the exceedance and
deconstruction activities will not be stopped.