NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
75 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
NYC-WTC_000427221–000427337OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 6 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 23 of 116
6.3.1 Decisions Based on Project Action Levels
The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern.
6.3.2 Target Air Quality Levels
6.3.2.1 Definitions of Exceedances
Any 24-hour PM2.5 and PAL, value in excess of the Target Air Quality Level will be considered an “exceedance” and the actions described below will be taken.
During the first week of sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific Trigger Level, will be considered an exceedance and the actions described below will be taken.
Pollowing the first week of sampling, a cumulative average will be established based initially on the first week’s results, to which will be added daily values as results are received from the laboratory. A cumulative average value for any analyte other than PM2 5 and PMio, in excess of the relevant Target Air Quality Level will be considered an exceedance and the actions described below will be taken.
6.3.2.2 Actions Based on Exceedances
Exceedance at any of the twelve (12) monitoring locations will be handled as set forth in the August 2005 Air Monitoring Plan.
Exceedances in any of the four (4) off-site elevated monitoring locations that do not coincide with exceedances in any of the eight (8) on-site air monitoring locations for the same parameter will result in an evaluation of engineering controls and work techniques in the Building. This evaluation shall determine whether: (i) negative pressure is being maintained in active work areas at the required levels (ii) there are breaches in the containment in active work areas, and (iii) there ai’e any visible emissions from the containment areas. If none of the above problems are identified, an off-site/regional source will be deemed the cause of the exceedance and deconstruction activities will not be stopped.
L2005-346 Rev. 1
CITY_DEP_WORBY_CANNATA_SUBP_000093755
NYC-WTC_000427244
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
75 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content