NYC 9/11 Public Portal Document
Table 3. Phase I -Abatement Phase Sampling and Analysis Summary
Location Parameter(s) Sample Frequency Analysis Method
7. PMIO Continuously “Real-Time” 7. EBAM
8. Mercury (vapor/gas) Each Day 8. lodatedCarbon
Trap/CVAF
Roof Top 1. Asbestos Each Day 1. TEM
(3 Locations) 2. Silica Each Day (24 hr. Basis) 2. XRD
3. Metals 3. XRF
4. PCDDs/PCDFs 4. TO 9 A (HRGCZHRMS)
5. PAHs 5. TO 13 A (GC/MS)
6. PCBs 6. TO 4 A (GC/MS)
7. PMtO Continuously “Real-Time” 7. EBAM
8. Mercury (vapor/gas) Each Day 8. lodated Carbon
Trap/CVAF
6.3 Phase II - Structural Deconstruction
During Phase II of the deconstruction project, air monitoring will take place at all seven (7)
stations each day. During the first three (3) days only of Phase II, samples will be collected for
semi-volatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day
period, samples for these organic parameters will be reduced to a single location per week
frequency employing the seven (7) station network. More specifically, samples will not be
collected using all seven (7) stations each day; rather a single set of samples will be collected
each day at a single station in the network. This sequence will be repeated each day using a
different station each day until all of the seven (7) stations have been used. In this manner a set
of samples will be collected at each location every seven (7) days.The schedule will be repeated
until project completion.
The semivolatile organic samples collected employing this weekly sampling frequency will not
be processed for analyses; rather they will be placed in archival storage at the laboratory. A
single set of samples will be selected from each sample set representing seven (7) days to
undergo analyses for PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after
consideration of the PM 10 data corresponding to the sites and days where organic samples were
collected. The station with the highest 24-hour average PM 10 concentration (ug/m3) recorded
with a collocated organic sample each week will be selected for analyses.
A summary of sampling frequencies on a target parameter specific basis applicable to the
demolition phase of the deconstruction program is provided in Table 4.
Table 4, Phase II - Structural Deconstruction Phase Sampling and Analysis Summary
Location Parameter(s) Sample Frequency Analysis Method
Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury
analyzer
Site Area Visible dust emissions Each Dav Visual observation
L2005-149 (051205) 2 5023623.2
CITY_DEP_WORBY_CANNATA_SUBP_000077403
NYC-WTC_000424967
OCR can misread numbers and units. Confirm readings against the page image before using them.