NYC 9/11 Public Portal Document
Table 4, Phase II - Structural Deconstruction Phase Sampling and Analysis Summary
Location Paranieter(s) Sample Frequency Analysis Method
Ground/Street 1. Asbestos Each Day, asbestos is 1. TEM
Level 2. Silica sampled each work shift 2. XRD
(4 Locations) 3. Metals 3. XRF
4. PCDDs/PCDEs Each Day (24 hr. Basis) 4. TO 9 A (HRGC/HRMS)
5. PAHs 5. TO 13 A (GC/MS)
6. PCBs 6. TO 4 A (GC/MS)
7. PMIO Continuously “Real-Time” 7. EBAM
8. Mercury (vapor/gas) Each Day 8. lodated Carbon
Trap/CVAE
Roof Top 1. Asbestos Each work shift 1. TEM
(3 Locations) 2. Silica Each Day (24 hr. Basis) 2. XRD
3. Metals 3. XRF
4. PCDDs/PCDEs 4. TO 9 A (HRGCZHRMs
5. PAHs 5. TO 13 A (GC/MS)
6. PCBs 6. TO 4 A (GC/MS)
7. PMIO Continuously “Real-Time” 7. EBAM
8. Mercury (vapor/gas) Each Day 8. lodated Carbon
Trap/CVAE
L2005-149 (051205) 3 5023623.2
CITY_DEP_WORBY_CANNATA_SUBP_000077404
NYC-WTC_000424968
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000424968Source: NYC Law Department, mirrored locally