NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Ambient air monitoring, 130 Liberty Street, May 2005

Machine-extracted title · confidence 55%

Chain-of-custody for ambient air monitoring at 130 Liberty Street with LMDC/NYC agency info, May 2005.

NYC-WTC_000424950–000424982
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.0 SAMPLING PHASES Sampling phases will consist of the following segments; Background, Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented below.

3.1 Background

The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed prior to the start of Phase I abatement activities. Samples will be collected using all seven (7) stations in the monitoring network. Target parameters and the frequency of sample collection will follow measures presented in Sections 4 and 6, respectively.

3.2 Phase I - Asbestos and COPC Abatement

Phase I of the Deconstnxction Project includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. Phase 11 - Structural Deconstruction includes the structural deconstruction of the remaining cleaned steel, large MEP, concrete, and curtain wall as well as cleaning and removal of exterior and roof, and roof equipment. During the Phase I cleanup and abatement, a minimum buffer zone of two floors, will be maintained between the active abatement (Phase I) area and the exterior abatement/structural demolition (Phase II) portion of the project. The proposed Phase I cleanup and abatement will be conducted so that the Building can be safely deconstructed to allow for redevelopment of the WTC Site. This Phase I project entails:

• The use of a licensed abatement contractor to perform Phase I work within a negative pressure enclosed work area;

• Work includes the removal and disposal of soft strip/interior gut items and general area cleanup of dust and debris;

• Removal and disposal of installed porous and certain non-porous building materials and components. Work includes removal and disposal of all interior non-structural elements including but not limited to ceiling tiles, carpet, gypsum wall board, mechanical, electrical and plumbing, wiring/cabling, fiberglass insulation, doors, fireproofing, toilet fixtures;

• Cleaning and salvage of certain installed non-porous building equipment and components contaminated by dust and debris;

• Removal of building materials containing asbestos which were present in the Building prior to September ll^**, 2001 (referred to herein as “ACBM”), primarily within the Building interior; and

Erection of the crane and hoist.

L2005-149 (051205) 1 5023623.2

CITY_DEP_WORBY_CANNATA_SUBP_000077395

NYC-WTC_000424959

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000424959Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000427190

Chain-of-custody for August 2005 ambient air monitoring at 130 Liberty Street deconstruction site, LMDC.

Similar indexed content

Compare copies and versions →