3.0 SAMPLING PHASES
Sampling phases will consist of the following segments: Background, Phase I - Asbestos and
COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work
included in each phase are presented below.
3.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar
days) of monitoring performed prior to the start of Phase I abatement activities. Samples will be
collected using all seven (7) stations in the monitoring network. Target parameters and the
frequency of sample collection will follow measures presented in Sections 4 and 6, respectively.
3.2 Phase I - Asbestos and COPC Abatement
Phase I of the Deconstruction Project includes the cleaning and removal of all interior surfaces
and non-structural elements within the building under containment. Phase II - Structural
Deconstruction includes the structural deconstruction of the remaining cleaned steel, large MEP,
concrete, and curtain wall as well as cleaning and removal of exterior and roof, and roof
equipment. During the Phase I cleanup and abatement, a minimum buffer zone of two floors,
will be maintained between the active abatement (Phase I) area and the exterior
abatement/structural demolition (Phase II) portion of the project. The proposed Phase I cleanup
and abatement will be conducted so that the Building can be safely deconstructed to allow for
redevelopment of the WTC Site. This Phase I project entails:
• The use of a licensed abatement contractor to perform Phase I work within a negative
pressure enclosed work area;
• Work includes the removal and disposal of soft strip/interior gut items and general area
cleanup of dust and debris;
• Removal and disposal of installed porous and certain non-porous building materials and
components. Work includes removal and disposal of all interior non-structural elements
including but not limited to ceiling tiles, carpet, gypsum wall board, mechanical,
electrical and plumbing, wiring/cabling, fiberglass insulation, doors, fireproofing, toilet
fixtures;
• Cleaning and salvage of certain installed non-porous building equipment and components
contaminated by dust and debris;
• Removal of building materials containing asbestos which were present in the Building
prior to September 11* 2001 (referred to herein as “ACBM”), primarily within the
Building interior; and
Erection of the crane and hoist.