Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
3.0 SAMPLING PHASES
Sampling phases will consist of the following segments: Background, Phase I - Preparation
Phase, Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction.
General descriptions of the work included in each phase are presented below.
3.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar
days) of monitoring performed prior to the start of Phase I - Preparation Phase activities.
Samples will be collected using the four (4) ground level stations in the monitoring network
(Locations 1-4 in Table 1) and one (1) station located on roof of the fire house (FDNY 10-10
House). Target parameters and the frequency of sample collection will follow measures
presented in Sections 4 and 6, respectively.
3.2 Phase I - Preparation Phase
The Phase I - Preparation Phase includes the erection of scaffolding and hoists on the full extent
of the exterior of the building, construction of interior hoist vestibules, erection of sidewalk
sheds and perimeter fencing, exterior negative pressure tent enclosures to implement the Pilot
Program, roof cleaning, localized facade and general exterior area clean-up and the removal of
existing netting on the exterior of the building.
3.3 Phase 1 - Asbestos and COPC Abatement
Phase I - Asbestos and COPC Abatement and Removal Phase includes the cleaning and removal
of all interior surfaces and non-structural elements within the building under containment. The
cleanup and abatement will be conducted so that the building at 130 Liberty (Building) can be
safely deconstructed to allow for redevelopment of the WTC Site. Phase I of the Deconstruction
Project will occur while the work area is placed under negative pressure containment and
includes the following general categories: (a) the general area cleanup of WTC dust and debris,
(b) removal and disposal of installed porous and certain non-porous building materials and
components, (c) cleaning and salvage of certain installed non-porous building equipment and
components, (d) removal of building materials containing asbestos which were present in the
Building prior to September 11*, 2001 (referred to herein as “ACBM”), primarily within the
Building interior, (e) packaging of asbestos and other regulated waste including, but not limited
to light bulbs, lighting ballasts, batteries, mercury-containing thermostats, etc. at generation
points, movement of containers to the decontamination unit and movement of decontaminated
containers to waste loading using an exterior hoist or crane, and (f) cleaning of exterior surfaces
of the Building (i.e., building washdown).
During all Phase I activities, a minimum buffer zone of three floors initially for the top three
floors and then two floors thereafter, will be maintained between the active abatement and clean
up (Phase I) area and the exterior abatement/structural deconstruction (Phase II) portion of the