6.0 SAMPLING FREQUENCY
6.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar
days) of monitoring performed immediately prior to the start of Phase I - Preparation Phase
activities. Samples will be collected at the four (4) ground level stations in the monitoring
network (Locations 1-4 in Table 1) and one (1) station located on the roof of the Fire Station
situated at 124 Liberty Street (FDNY 10-10 House). All target parameters will be collected over
a 24-hour integrated period with the exception of asbestos, silica, PMio, PM2.5, and mercury
utilizing the Lumex instrument. PMioand PM2.5 will be monitored continuously at each of the
five (5) sites while asbestos and silica measurements will be taken at a frequency of once per
work shift at each of the sites.
6.2 Phase 1 - Preparation Phase
The Phase I - Preparation Phase air monitoring will follow the schedule and frequency as
described below and will commence with the start of Preparations Phase site work.
During the first three (3) days only of Phase I Preparation Phase work, samples will be collected
and analyzed for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this
first three (3) day period, sampling for semivolatile organics will be reduced to a once per week
frequency employing the entire station network. One day per week on a rotating basis (week #1
Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The
schedule will be repeated until project completion.
The semivolatile organic samples collected employing this sampling frequency will not be
processed for analyses; rather they will be placed in archival storage at the laboratory. A single
set of samples will be selected from each weekly sampling event to undergo analyses for
PCDDs/PCDFs, PAHs and PCBs. The station with the highest 24-hour average PMio
concentration (ug/m3) recorded with a collocated organic sample each week will be selected for
semivolatile organic analyses.
Roof Cleaning: four (4) ground level stations and one (1) off-site elevated station (Locations 1-5
in Table 1) and four (4) rooftop locations. Target parameters for these stations will follow those
presented in Section 4.
Scaffold Erection and associated tasks: Scaffold erection up to and including completion of
scaffold work on the 10**' Floor - four (4) ground level stations and one (1) off-site elevated
station (Locations 1-5 in Table 1). Target parameters and the frequency of sample collection for
these stations will follow those presented in Section 4. Once the scaffold erection work is
completed on the 10* floor, seven (7) additional stations (Locations 6-12) will be installed.
Target parameters for these additional stations will follow measures presented in Section 4. As