NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.
NYC-WTC_000427865–000427899OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
6.0 SAMPLING FREQUENCY 6.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed immediately prior to the start of Phase I - Preparation Phase activities. Samples will be collected at the four (4) ground level stations in the monitoring network (Locations 1-4 in Table 1) and one (1) station located on the roof of the Fire Station situated at 124 Liberty Street (FDNY 10-10 House). All target parameters will be collected over a 24-hour integrated period with the exception of asbestos, silica, PMio, PM2.5, and mercury utilizing the Lumex instrument. PMioand PM2.5 will be monitored continuously at each of the five (5) sites while asbestos and silica measurements will be taken at a frequency of once per work shift at each of the sites.
6.2 Phase 1 - Preparation Phase
The Phase I - Preparation Phase air monitoring will follow the schedule and frequency as described below and will commence with the start of Preparations Phase site work.
During the first three (3) days only of Phase I Preparation Phase work, samples will be collected and analyzed for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, sampling for semivolatile organics will be reduced to a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The schedule will be repeated until project completion.
The semivolatile organic samples collected employing this sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. The station with the highest 24-hour average PMio concentration (ug/m3) recorded with a collocated organic sample each week will be selected for semivolatile organic analyses.
Roof Cleaning: four (4) ground level stations and one (1) off-site elevated station (Locations 1-5 in Table 1) and four (4) rooftop locations. Target parameters for these stations will follow those presented in Section 4.
Scaffold Erection and associated tasks: Scaffold erection up to and including completion of scaffold work on the 10**' Floor - four (4) ground level stations and one (1) off-site elevated station (Locations 1-5 in Table 1). Target parameters and the frequency of sample collection for these stations will follow those presented in Section 4. Once the scaffold erection work is completed on the 10* floor, seven (7) additional stations (Locations 6-12) will be installed. Target parameters for these additional stations will follow measures presented in Section 4. As
6-1
CITY_DEP_WORBY_CANNATA_SUBP_0001 01633
NYC-WTC_000427883
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
45 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231976
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
45 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421884
Final Revised ambient air monitoring plan for 130 Liberty Street; August 24, 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231976
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similar indexed content
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
Similar indexed content
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
Similar indexed content
NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
Similar indexed content
NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
Similar indexed content