Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000231976–000232010
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
3.0 SAMPLING PHASES Sampling phases will consist of the following segments: Background, Phase I - Preparation Phase, Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented below.
3.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed prior to the start of Phase I - Preparation Phase activities. Samples will be collected using the four (4) ground level stations in the monitoring network (Locations 1-4 in Table 1) and one (1) station located on roof of the fire house (FDNY 10-10 House). Target parameters and the frequency of sample collection will follow measures presented in Sections 4 and 6, respectively.
3.2 Phase I - Preparation Phase
The Phase I - Preparation Phase includes the erection of scaffolding and hoists on the full extent of the exterior of the building, construction of interior hoist vestibules, erection of sidewalk sheds and perimeter fencing, exterior negative pressure tent enclosures to implement the Pilot Program, roof cleaning, localized facade and general exterior area clean-up and the removal of existing netting on the exterior of the building.
3.3 Phase 1 - Asbestos and COPC Abatement
Phase I - Asbestos and COPC Abatement and Removal Phase includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. The cleanup and abatement will be conducted so that the building at 130 Liberty (Building) can be safely deconstructed to allow for redevelopment of the WTC Site. Phase I of the Deconstruction Project will occur while the work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11*, 2001 (referred to herein as “ACBM”), primarily within the Building interior, (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury-containing thermostats, etc. at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading using an exterior hoist or crane, and (f) cleaning of exterior surfaces of the Building (i.e., building washdown).
During all Phase I activities, a minimum buffer zone of three floors initially for the top three floors and then two floors thereafter, will be maintained between the active abatement and clean up (Phase I) area and the exterior abatement/structural deconstruction (Phase II) portion of the
3-1
CITY_DEP_WORBY_CANNATA_SUBP_000057076
NYC-WTC_000231986
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
26 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
33 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
8 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150109
Department of Environmental Protection report detailing ambient outdoor air monitoring for asbestos fibers.
4 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
8 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
24 shared non-person entities · 1 shared topics · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
24 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160471
Report on decontamination instructions for contractors and air clearance monitoring near Ground Zero at Battery Park City.
6 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162838
Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
9 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Liberty Plaza · 1 pages · confidence 0.15 · verify page 1
- 110 Greenwich Street · 1 pages · confidence 0.15 · verify page 10
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similar indexed content
Similar indexed content
NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similar indexed content
Department of Environmental Protection report detailing ambient outdoor air monitoring for asbestos fibers.
Similar indexed content