NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
NYC-WTC_000442832–000442866OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
3.0 SAMPLING PHASES Sampling phases will consist of the following segments: Background, Phase I - Preparation Phase, Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented below.
3.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed prior to the start of Phase I - Preparation Phase activities. Samples will be collected using the four (4) ground level stations in the monitoring network (Locations 1-4 in Table 1) and one (1) station located on roof of the fire house (FDNY 10-10 House). Target parameters and the frequency of sample collection will follow measures presented in Sections 4 and 6, respectively.
3.2 Phase I - Preparation Phase
The Phase I - Preparation Phase includes the erection of scaffolding and hoists on the full extent of the exterior of the building, construction of interior hoist vestibules, erection of sidewalk sheds and perimeter fencing, exterior negative pressure tent enclosures to implement the Pilot Program, roof cleaning, localized fagade and general exterior area clean-up and the removal of existing netting on the exterior of the building.
3.3 Phase I - Asbestos and COPC Abatement
Phase I - Asbestos and COPC Abatement and Removal Phase includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. The cleanup and abatement will be conducted so that the building at 130 Liberty (Building) can be safely deconstructed to allow for redevelopment of the WTC Site. Phase I of the Deconstruction Project will occur while the work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11“*, 2001 (referred to herein as “ACBM”), primarily within the Building interior, (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury-containing thermostats, etc. at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading using an exterior hoist or crane, and (f) cleaning of exterior surfaces of the Building (i.e., building washdown).
During all Phase I activities, a minimum buffer zone of three floors initially for the top three floors and then two floors thereafter, will be maintained between the active abatement and clean up (Phase I) area and the exterior abatement/structural deconstruction (Phase II) portion of the
3-1
CITY_21MC100_003218793
NYC-WTC_000442842
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231976
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427865
Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
44 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
Similar indexed content
NYC-WTC_000446764
Chain-of-custody for ambient air samples from the 130 Liberty Street deconstruction project.
Similar indexed content
NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similar indexed content
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
Similar indexed content
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similar indexed content