NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-02 Registered architect. “Registered architect” (RA) shall mean an individual licensed or otherwise authorized by the New York State Department of Education, Division of Professional Licensing Services, to practice architec­ ture and use the title Registered Architect. Removal. “Removal” shall mean the stripping of any asbestos-containing materials from surfaces or components of a facility or taking out structural components in accordance with 40 CFR 61 Subparts A and M. Renovation. “Renovation” shall mean an addition or alteration or a change or modification of a building or the service equipment thereof, that is not classified as an ordinary repair as defined in §27-125 of the Administrative Code of the City of New York. Repair. “Repair” shall mean corrective action using specified work practices e.g. glovebag, plastic tent procedures, etc. to minimize the likelihood of fiber release from minimally damaged areas of ACM. Replacement material. “Replacement material” shall mean any material used to replace ACM that contains less than .01 percent asbestos. Shift “Shift” shall mean a worker’s, or simultaneous group of workers’, complete daily term of work. Shower room. “Shower room” shall mean a room between the clean room and the equipment room in the worker decontamination enclosure with hot and cold running water controllable at the tap and arranged for complete showering during decontamination. Small asbestos project. “Small asbestos project” shall mean an asbestos project involving the disturbance (e.g., removal, enclosure, encapsulation) of more than 25 and less than 260 linear feet of friable asbestos-containing material or more than 10 and less than 160 square feet of finable asbestos­ containing material. Staging area. “Staging area” shall mean the work area near the waste transfer airlock where containerized asbestos waste has been placed prior to removal from the work area. Strip. “Strip” shall mean to remove friable asbestos materials from any part of the facility. Structural member. “Structural member” shall mean any load-supporting member of a facility, such as beams and load-supporting walls, or any nonload-supporting member, such as ceiling and nonload-supporting walls. Surface barriers. “Surface barriers” shall mean the plasticizing of walls, floors, and fixed objects within the work area to prevent contamination from subsequent work. Surfactant. “Surfactant” shall mean a chemical wetting agent added to water to improve penetration.

5669 RCNY 5-31-98

CITY_21MC100_006242941

NYC-WTC_000411810

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411810Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →