CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-02
Registered architect. “Registered architect” (RA) shall mean an individual
licensed or otherwise authorized by the New York State Department of
Education, Division of Professional Licensing Services, to practice architec
ture and use the title Registered Architect.
Removal. “Removal” shall mean the stripping of any asbestos-containing
materials from surfaces or components of a facility or taking out structural
components in accordance with 40 CFR 61 Subparts A and M.
Renovation. “Renovation” shall mean an addition or alteration or a change
or modification of a building or the service equipment thereof, that is not
classified as an ordinary repair as defined in §27-125 of the Administrative
Code of the City of New York.
Repair. “Repair” shall mean corrective action using specified work practices
e.g. glovebag, plastic tent procedures, etc. to minimize the likelihood of fiber
release from minimally damaged areas of ACM.
Replacement material. “Replacement material” shall mean any material
used to replace ACM that contains less than .01 percent asbestos.
Shift “Shift” shall mean a worker’s, or simultaneous group of workers’,
complete daily term of work.
Shower room. “Shower room” shall mean a room between the clean room
and the equipment room in the worker decontamination enclosure with hot
and cold running water controllable at the tap and arranged for complete
showering during decontamination.
Small asbestos project. “Small asbestos project” shall mean an asbestos
project involving the disturbance (e.g., removal, enclosure, encapsulation) of
more than 25 and less than 260 linear feet of friable asbestos-containing
material or more than 10 and less than 160 square feet of finable asbestos
containing material.
Staging area. “Staging area” shall mean the work area near the waste
transfer airlock where containerized asbestos waste has been placed prior to
removal from the work area.
Strip. “Strip” shall mean to remove friable asbestos materials from any part
of the facility.
Structural member. “Structural member” shall mean any load-supporting
member of a facility, such as beams and load-supporting walls, or any
nonload-supporting member, such as ceiling and nonload-supporting walls.
Surface barriers. “Surface barriers” shall mean the plasticizing of walls,
floors, and fixed objects within the work area to prevent contamination from
subsequent work.
Surfactant. “Surfactant” shall mean a chemical wetting agent added to
water to improve penetration.
5669 RCNY 5-31-98