Project worksheet, PS 89 air testing, 2002

Machine-extracted title · confidence 41%

FEMA project worksheet describing air-monitoring stations and testing at PS 89 interior.

NYC-WTC_000411670–000411671
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

j Parameter i' Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55 Winter: 68-75 degrees at 50% RH I I Relative Humidity (RH) 30-60%____________________ ASHRAE 55 1 Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62 1' background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHRAE 62) Total Volatile Organic Compounds 1 ppm AIHA ---- — (TVOC)______________________ I Respirable Particulates (PM 25) 6.5 micrograms per cubic meter of air USEPA NPAAQS-G 1 for general population; 40 micrograms per cubic meter of air USEPA H which is recommended for sensitive individuals and children I “ I USEPA= United States Environmental Protection Agency i NPAAQS= National Pnmary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ,A.SHR6E= American Society of Heating, Refrigerating, and Air Conditioning Engineers

( ContractCos^

: Tlie total contract cost from March 1, 2002 to June 30, 2002 (the end of the school year) is estimated to be $156,856.62. A : letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 89 is 1 attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total I eligible cost: I The eligible costs incuned from March 1, 2002 to June 30, 2002 (122 days) =5156,856.62

59,000/7 days = $1,285.71 per day $1,285.72 X 122 days= $156,856,62

I Percentage of Work Completed |

j The percentage of work complete was calculated through May 6, 2002. As such, for 67 days of the 122 day period, the work ! performed by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the dollar I amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates,

67 days/122 day period = 67/122 = 55% of the work complete.

: Prepared By: Matt Talley, Project Officer FEMA Form 99-91 (BACK), Sep 98

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007970110

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411671

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411671Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000187879

FEMA project worksheet detailing air monitoring stations and testing schedules established at a New York City school in early 2002.

Similar indexed content

Compare copies and versions →