Project worksheet, PS 477 interior air testing, Apr 2001

Machine-extracted title · confidence 42%

FEMA project worksheet for PS 477 interior air testing; 13 tests/day.

NYC-WTC_000385861–000385862
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Fjranwter Temperature (T) I rar;;^ Summer: 73-79 degrees at 50% RH I Agency or Organization A ASHRAE 55 ~El Winter: 68-75 degrees at 50% RH Relative Humidity (RH) 30-60% ASHRAE 55 Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHRAE 62) Total Volatile Organic Compounds 1 ppm (TVOC) Respirable Particulates (PM 25) I 65 micrograms per cubic meter of air | US NPAAQS

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from December 1, 2001 to June 30, 2002 is estimated to be $443,697.29. A letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 477 is attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost;

Number of days between September 11,2001 through February 11, 2002= 153 days Number of days between December 1, 2001 through Febmary 12, 2002= 73 days Number of days between February 12, 2002 through June 30,2002= 139 days

The eligible costs incurred from December 1, 2001 to February 11, 2002= $76,339.75

Given cost of services= $160, EE .00 (see attached sheet) $160,000.00 /153 days = $1,045.75 per day $1,045.75 * 73 days = $76,339.75

The eligible costs incurred from February 12, 2002 to June 30, 2002= $367,357.54

Given cost of services= $18,500.00 per week (see attached sheet) $18,500.00 /7 days = $2,642.86 per day $2,642.86 * 139 days = $367,357.54

The total eligible costs incurred from December 1, 2001 to June 30, 2002= $443,697.29

$367,357.54 + $76,339.75= $443,697.29

Prepared By: Matt Talley, Project Officer FEMA Form 90-91 (BACK). Sep 98

CITY_21MC100_0 09214791

NYC-WTC_000385862

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385862Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411648

FEMA worksheet detailing air-testing locations and schedule for PS 833.

Similar indexed content

NYC-WTC_000187879

FEMA project worksheet detailing air monitoring stations and testing schedules established at a New York City school in early 2002.

Similar indexed content

Compare copies and versions →