Project worksheet, PS 894 air testing, 2001

Machine-extracted title · confidence 40%

FEMA project worksheet for interior/exterior air monitoring at PS 894; testing details.

NYC-WTC_000411660–000411661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Paramfetef QIMB Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55 Winter; 68-75 degrees at 50% RH Relative Humidity (RH) ■30^60% ASHRAE 55 Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHRAE 62) ifotal Volatile Organic Compounds I ppm AIHA ~ j (TVOC) Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G for general population USEPA

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers i : Contract Costs

The total contract cost from September 12, 2001 to January 20, 2002 is estimated to be $40,241.89. A letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 894 attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost;

The total costs from September 12, 2001 to February 11, 2002 are $47,000.00. The total was adjusted to only include 131 of the 153 days. The cost per day, provided by the applicant, is $307.19 per day. The total adjusted ehgible cost is $40,241.89. Please see attached sheet.

Given Cost of Services= $47,000.00 (see attached sheet) Given 153 days= $307.19/day $307.191131 eligible days= $40,241.89

Percentage of Work Completed I rhe percentage of work complete was calculated through January 20, 2002. As such, all of the work performed by ATC .Associates has been completed. The BoE has not been invoiced for-these costs, and therefore the dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

i 131 days/ 131 day period = 100% of the work complete.

I Prepared By: Matt Talley, Project Officer ..... 7TMA7A;/Tu77n3:\CK:. Ser ‘A

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969973

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411661

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411661Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411648

FEMA worksheet detailing air-testing locations and schedule for PS 833.

Similar indexed content

Compare copies and versions →