Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Night shift daily workforce report for World Trade Center site, December 11, 2001.

NYC-WTC_000408094
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 eih Road, Whitestond, N.Y. 11357-(718) 7B7-9000 DATE; DECEMBER 11, 2001 (NIGHT FINAL) 8PM ---------- —' DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No, Weather Conditions C LEAR & MILD

Labor CLASSIFICATION QUANT. Description MANNED STANDBY IDLS SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE________ 1 OFFICE ENGINEER j CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 .SAFETY OFFICER ‘ CAT 375 GRAPPLER 1 LABORERS , 17 HITACHI 750 GRAPPLER 1 |1RON WORKERS i~ HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 ; 7 HITACHI 1200 GRAPPLER 1 CARPENTER i 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS ' 1 TOOL TRUCK 1 HOUSE WRECKERS ! 12 TOOLVAN ROLLOFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUELTRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS__________ ■ DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH ■ 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS ■ FLASHING ARROW BOARD 1 USED 446 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 DELAYS: ■ FLAT TRUCK 1 1200 DOWN FROM 11:45 TO 1:15- RECOV^ ■ PUMP 2 |375 DOWN FROM 10:p0 TO 10:30- RECOVERY ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work; WORK COMPLETED_______________________

I LOAD OUT STEEL AND DEBRIS 35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS______________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title; BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1211N.xls

02.200076

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758171

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408094

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408094Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →