NYC-WTC_000278604
Night final daily workforce and weather noted for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce and equipment at World Trade Center, Dec 13, 2001.
NYC-WTC_000429723OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP, 151-456thRoad, Whitestone,!N.Y. 11357-(718)767-9000 DATE: DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT
I Job Name & Location:: World Trade Center Contract No. j Weather Conditions VERY MILD AND FOGGY
Equipment Labor CLASSIFICATION QUANT, I Description MANNED STANDBY IDLE SUPERINTENDENT ■ 1 CAT 966 LOADER 1 PROJECT ENGINEER ’ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN ! 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS i HITACHI 550 GRAPPLER 1 LOCAL 14 i 5 HITACHI 550 GRAPPLER . 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS_______ _ 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS I 9 TOOL VAN ROLL OFF DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE __ LOW BED TRAILER I north of VISTA & PASSING TO TO 750 - 750 LOADING HIGH DECK TRAILERS TULLY EUKES & FLATS IN BOTTOM OF PIT WELDING TRUCK 973 ALSO LOADING IN BOTTOM FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW PUMP 2 78 OUT OF AMEC (53 GRACE, 25 DOS/DOT) ROLLER ■ RAINMAKER7GENIE LIFT 1 ■ 550 BUCKET 1 Description of Work: WORK PERFORMED I_______________________________________ LOAD OUT STEEL AND DEBRIS_______________________________ MANNED TARPING AND TRIMMING STATIONS___________________ MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2
,SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253
GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1213N.xls
_02_._200072
CITY_21MC100_004144435
NYC-WTC_000429723
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278604
Night final daily workforce and weather noted for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388383
Night final daily workforce at World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291290
Night final daily workforce report for World Trade site with weather notes (Dec 13, 2001).
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361472
Night final daily workforce report for World Trade Center site on Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305192
Night final workforce and equipment for World Trade, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291294
Night final daily workforce report for World Trade site with conditions (Dec 11, 2001).
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280102
Night final daily workforce report for World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237597
A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267228
Night final daily workforce and equipment for World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408092
Daily workforce and equipment listing for World Trade Center project, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322147
Night final daily workforce and equipment roster for World Trade Center site, December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278604
Night final daily workforce and weather noted for World Trade site, Dec 13, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388383
Night final daily workforce at World Trade Center, Dec 13, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291290
Night final daily workforce report for World Trade site with weather notes (Dec 13, 2001).
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361472
Night final daily workforce report for World Trade Center site on Dec 13, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305192
Night final workforce and equipment for World Trade, Dec 13, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278604
Night final daily workforce and weather noted for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000388383
Night final daily workforce at World Trade Center, Dec 13, 2001.
Similar indexed content
NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000291290
Night final daily workforce report for World Trade site with weather notes (Dec 13, 2001).
Similar indexed content
NYC-WTC_000361472
Night final daily workforce report for World Trade Center site on Dec 13, 2001.
Similar indexed content