NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade site, Dec 2001

Machine-extracted title · confidence 38%

Night final daily workforce report for World Trade site with conditions (Dec 11, 2001).

NYC-WTC_000291294
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357.(718)767-9000 DATE: DECEMBER 11,2001 (NIGHT FINAL) 8PM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & MILD

Labor I Equipment : classificatioTT QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT > 2 [CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE ~ 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS________ 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS_____ 1 TOOL TRUCK 1 HOUSE WRECKERS • 12 TOOL VAN ROLL OFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUELTRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH ■ 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS ■ FLASHING ARROW BOARD 1 USED 446 ' OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 DELAYS: ■ FLAT TRUCK 1 1200 DOWN FROM 11:45 TO 1:15 - RECOVERY ■ PUMP 2 375 DOWN FROM 10:00 TO 10:30 - RECOVERY ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: WORK COMPLETED________________________ LOAD OUT STEEL AND DEBRIS 35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS_____________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: ~BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1211N.xls

CITY_21MC100_004956918

NYC-WTC_000291294

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291294Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →