NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Daily workforce and equipment listing for World Trade Center project, December 12, 2001.

NYC-WTC_000408092
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ! 151.45 6th Road, Whitestonel, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 12, 2001 (NIGHT FINAL) = DAILY WORK FORCE REPORT

Job Name & Location! World Trade Center Contract No. ; Weather Conditions COOL ■ OVERCAST & DRIZZLE sssssssss Labor [I Equipment QUANT. I CLASSIFICATION Description MANNED STANDBY IDLE SUPERINTENDENT i 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 |CAT 446 BACKHOE 1 OFFICE ENGINEER j_________________ 1 [cat 973 LOADER ~ 1 FOREMEN 2 |CAT 365 GRAPPLER ~ 1 SAFETY OFFICER CAT 375 GRAPPLER 3 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS IHITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS ; 12 TOOL VAN ROLLOFF 1200 PASSING MATERIAL FROM WEST SLOPE TO DUMP TRAILERS BOTTOM OF HOLE - 750/ 375 LOADING OUT LOW BED TRAILER EUKES AND FLATS. 973 ALSO LOADING EUKES. HIGH DECK TRAILERS WELDING TRUCK CONTINUED WIDENING ROAD TO AMEC SITE FUEL TRUCK 1 PICKUP TRUCKS 2 550 LOADING TRUCKS FROM TOP TO GRACE TRUCKS LIGHT TOWERS 13 SITE MULE 3 BURNERS CONTINUED ON NORTH WALL DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK LOADS OUT;______ A___________________ ■ FLASHING ARROW BOARD 1 GRACE - 35 LOADS i ■ OFFICE TRAILER/GENER. 1 TULLY AREA 61 EUKES AND 10 FLATS ■ CARGO BOXES 3 AMEC -105 TOTAL (39 GRACE AND 65 DOS) ■ FLAT TRUCK 1 ■ PUMP 2 ' ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: COMPLETED WORK___________________ .LOAD OUT STEEL AND DEBRIS______ ________________________________ MANNED TARPING AND TRIMMING STATIONS__________________________________ MANNED WATER STATIONS FOR DUST CONTROL_______________________________ MAINTAINED TRAFFIC FLOW IN AND OUT OF AREA CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLED OF GPS SYSTEMS________________________________________________ ELEVATIONS; ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By; Title: BY: For; SUPERINTENDENT

DAILY WORK FORCE REPORT 1212N.xls ! 02.2130074

CONFIDENTIAL INSURANCE INFORI4AT ION, CITY_21MC100_002758169

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408092

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408092Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →