NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 12, 2001

Machine-extracted title · confidence 42%

Night shift workforce and equipment at World Trade Center, Dec 12, 2001.

NYC-WTC_000291367
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 8th Road, Whitestond. N.Y. 11357-(718) ;’67-900C DATE: DECEMBER 12, 2001 (NIGHT FINAL) 1 DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions COOL - OVERCAST & DRIZZLE

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT ; 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER j______________ 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER T IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS . 12 TOOL VAN ROLL OFF 1200 PASSING MATERIAL FROM WEST SLOPE TO DUMP TRAILERS BOnpMOFjHOLE;^750£375J;^AD^ OUT LOW BED TRAILER EUKES AND FLATS. 973 ALSO LOADING EUKES. HIGH DECK TRAILERS WELDING TRUCK CONTINUED WIDENING ROAD TO AMEC SITE FUEL TRUCK 1 PICKUP TRUCKS 2 550 LOADING TRUCKS FROM TOP TO GRACE TRUCKS LIGHT TOWERS 13 SITE MULE 3 BURNERS CONTINUED ON NORTH WALL DUMP TRUCKS 10 WHEEL DUMP TRUCK LOADS OUT; FLASHING ARROW BOARD 1 GRACE - 35 LOADS , OFFICE TRAILER/GENER. 1 TULLY AREA 61 EUKES AND 10 FLATS CARGO BOXES 3 |aMEC - 105 TOTAL (39 GRACE AND 65 DOS) FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:____________________________________________________________ COMPLETED WORK___________________________________________________________ LOAD OUT STEEL AND DEBRIS_________________________________________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL________________________________ MAINTAINED TRAFFIC FLOW IN AND OUT OF AREA_______________________________ CONTINUED REMOVING DEBRIS FROM LOY/ER LEVELS OF NW CORNER OF TOWER 2 INSTALLED OF GPS SYSTEMS__________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: BY; For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1212N.xls

CITY_21MC100_003180488

NYC-WTC_000291367

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291367Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →