Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 32%

Night final daily workforce report for World Trade site, Dec 13, 2001; includes conditions.

NYC-WTC_000388448
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-46 6lh Rosd, Whitestona, N.Y. 11357-(716) 787-9000 DATE: DECEMBER 13. 2001 (NIGHT FINAL) asnBaEjbBBBSSSaSBSaSBSS»BSXS3SSSSSS&SS5 e;00AM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions VERY MILO AND FOGGY

Equipment ___ U CLASSIFICATIQN QUANT. ■MBBSSSSaSKOSSSSKSaS^SSS Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS___________ 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_________ HITACHI 550 GRAPPLER 1 LOCAL 15_________ 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS__________ 1 MECHANICS TRUCK 1 1 MECHANICS__________ 1 TOOL TRUCK HOUSE WRECKERS 9 TOOL VAN ROLL OFF DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE I ■ LOW BED TRAILER NORTH OF VISTA & PASSING TO TO 750 - 750 LOAPl^ ■ HIGH DECK TRAILERS TULLY EUKES & FLATS IN BOTTOM OF PIT ~ ■ WELDING TRUCK 973 ALSO LOADING IN BOTTOM __ ■ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS.' ■ PICKUP TRUCKS 2 ■ LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE ■ SITE MULE 3 ■ DUMP TRUCKS 973 LEAKING MOTOR OIL ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 38 LOADS ■ GRACE - NORTH ROAD , ■ FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW , ■ PUMP 2 78 OUT OF AMEC (53 GRACE, 25 DOS/DOf)' ■ ROLLER ■ RAINMAKER/GENIE LIFT 1 ■ 550 BUCKET 1 Description of Work: WORK PERFORMED______________ ___________________________ LOAD OUT STEEL AND DEBRIS ___________________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWE^

SET MATS FOR TIEBACK INSTALLAfION ELEVATIONS: ALL MACHINES LEVEL B-S 253

GRACE CONTRACTING CORP Approved By: Title: BY; For: SUPERINTENDENT *

DAILY WORK FORCE REPORT 1213N.xls

CITY_21MC100_003715467

NYC-WTC_000388448

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388448Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →