NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Chain-of-custody report, NYC Design and Construction

Machine-extracted title · confidence 28%

Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.

NYC-WTC_000408090
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6tn Road, wflitestona, N.Y. 11367-(718)7B7-9000 DECEMBER 13, 2001 (NIGHT FINAL) DATE; 6:00AM DAILY WORK FORCE REPORT

j ______ Job Name & Location:; World Trade Center Contract No. j Weather Conditions VERY MILD AND FOGGY

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT : 1 CAT 966 LOADER 1 PROJECT ENGINEER ’ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN ' 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS I HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER . 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 11185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1235 HAMMER HOE RAM 1 TEAMSTERS 1 1 MECHANICS TRUCK 1 1 MECHANICS 1 ■ TOOL TRUCK HOUSE WRECKERS I 9 ■ TOOL VAN ■ ROLL OFF ■ DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE ' LOW BED TRAILER NORTH OF VISTA & PASSING TO TO 750 - 750 LOADING ■ HIGH DECK TRAILERS TULLY EUKES & FLATS IN BOTTOM OF PIT ■ WELDING TRUCK 973 ALSO LOADING IN BOTTOM____________________ ■ FUELTRUCK 1 365 UP ON TOP - LOADING TRAILERS ■ PICKUP TRUCKS 2 ■ LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE ' SITE MULE 3 ■ DUMP TRUCKS 973 LEAKING MOTOR OIL ' 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD_______ ■ FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW PUMP 2 78 OUT OF AMEC (53 GRACE, 25 DOSZDOT) ■ ROLLER RAINMAKERZGENIE LIFT 1 ■ 550 BUCKET 1 Description of Work: WORK PERFORMED i______________________________________ LOAD OUT STEEL AND DEBRIS__________ ____________________ MANNED TARPING AND TRIMMING STATIONS__________________ |MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Tide: BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1213N.xls

^02...20007_2

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758167

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408090

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408090Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →