I GRACE CONTRACTING CORP. 15145 6th Road, Whfteston^, NY. 11357-(718) 767-6000 DATE; MONDAY DECEMBER-10-01 FINAL NIGHT DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. ' Weather Conditions OVERCAST - MILD
Labor Equipment ssa=a=sssss^sssss= CLASSIFICATION QUANT. Description (MANNED STANDBY IDLE SUPERINTENDENT : 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS. 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_______ i___________ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 i 8 HITACH11200 GRAPPLER 1 CARPENTER_____ .____________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS - FUEL TRUCK 1 MECHANICS TRUCK 1 1 MECHANICS I 1 TOOL TRUCK 1 HOUSE WRECKERS i 3 TOOLVAN ROLL OFF TRUCKING TEAMSTERS - BOVIS 22 DUMP TRAILERS 21 TRUCKING TEAMSTERS 5 LOW BED TRAILER HIGH DECK TRAILERS 6 750 & 375 AT BOTTOM OF PIT LOADING OUT STEEL WELDING TRUCK ONTO TULLYS EUKES & FLATS FUEL TRUCK 1 PICKUP TRUCKS 2 1200 ON WEST SLOPE FEEDING MATERIAL TO 36S LIGHT TOWERS 13 WHICH LOADED OUR TRAILERS SITE MULE 3 DUMP TRUCKS 973 STOCKPILING LOOSE MATERIAL AT BOTTOM OF PIT 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 KIETH - GRACE MECHANIC INSTALLED GPS ON OFFICE TRAILER/GENER. 1 5 TRUCKS - WORKED ON THIS UNTIL 12:45 AM CARGO BOXES 3 FLAT TRUCK 1 WE LOADED OUT 42 LOADS____________________ PUMP 2 LOADED 42 OF TULLYS EUKES ROLLER 1 LOADED 24 OF TULLYS FLATS__________________ RAINMAKER/GENIE LIFT 1 84 LOADS WENT OUT FROM AMEC IN DOS TRUCKS Description of Work;
CONTINUE REMOVAL OF DEBRIS .MANNED TARPING STATIONS____________________ MANNED WATERING STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA
GRACE CONTRACTING CORP Approved By; Title: BY: For; SUPERINTENDENT
DAILY WORK FORCE REPORT 1210N.xls 02.200078
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758173
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000408096
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429729
Night final daily workforce and equipment at World Trade Center, Dec 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291371
Night final daily work force report for World Trade Center site, Dec 10, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302397
Daily workforce and equipment report for World Trade Center project, December 14, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429731
Night shift daily labor/equipment listing for World Trade Center, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291363
Night shift workforce and equipment at World Trade Center, Dec 12-13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269221
Night preliminary daily workforce report for World Trade site; crews and gear listed.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291296
Night final daily workforce report for World Trade site (Dec 10, 2001).
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278677
Daily workforce and equipment list for World Trade Center site, December 10, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429729
Night final daily workforce and equipment at World Trade Center, Dec 10, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291371
Night final daily work force report for World Trade Center site, Dec 10, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429729
Night final daily workforce and equipment at World Trade Center, Dec 10, 2001.
Similar indexed content
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similar indexed content
NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
Similar indexed content
NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similar indexed content