NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Night final daily workforce and equipment, World Trade Center, Dec 8, 2001.

NYC-WTC_000389482
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. [ 151.4561hRoad, Whitestone. N.Y. Itjsr-(7'8)767-9000 DATE: SATURDAY DECEMBER 8, 2001 (NIGHT FINAL)

daily work force report

Job Name & Location: World Trade Center ( Contract No. . Weather Conditions COLD RAIN ALL NIGHT =s=s=sss=s=:=&sss== Labor j Equipment ___JL CLASSIFICATION QUANT. T Descriplion MANNED TANDBY IDLE] SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN_____________ 2 CAT365GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 ■

LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS ' HITACHI 550 GRAPPLER 1 LOCAL 14 4 ' HITACHI 550 GRAPPLER 1 LOCAL 15 8 ' HITACH11200 GRAPPLER 1 [carpenter ■ 185 CFM COMPRESSOR 1 [carpenter FOREMAN ■ 235 HAMMER HOE RAM 1 TEAMSTERS 11 ' MECHANICS TRUCK 1 1 MECHANICS ■ TOOL TRUCK HOUSE WRECKERS 6 ■ TOOL VAN ■ ROLL OFF EXCAVATED SOUTH TOWER DEBRIS TOWARDS WEST ' DUMP TRAILERS 8 LOADED TULLYS EUKES I ■ LOW BED TRAILER IHOERAMMED CONCRETE ON REMAINS OF NORTH WALL ■ HIGH DECK TRAILERS 2 |l200 DOWN WHEN SHIFT STARTED - REPAIRED THEN ■ WELDING TRUCK [grapple BROKE - REPLACED WITH 750 ' ■ FUEL TRUCK 1 [received NEW GRAPPLE FOR 1200 TONITE ■ PICKUP TRUCKS 1 235 DAMAGED - FUEL TANK LEAKING ‘AND HYDRAULIC ■ LIGHT TOWERS 13 LEAK FROM UNDERCARRAGE i ’ SITE MULE 3 ' DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ■ FLAT TRUCK IPUMP ' 2 Iroller ' ~ Irainmaker/genie lift 1 ■

Description of Work; • ; LOADS OUT; 64 LOADED 43 EUKES ■__________________________________________________ LOAD OUT STEEL AND DEBRIS ; _________________________________________ MANNED TARPING AND TRIMMING STATIONS

MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY

ELEVATIONS: ALL MACHINES LEVEL B-5 253 —— —— DELAYS; i ' GRACE CONTRACTING CORP Approved By; TiUe; ■“ BY; For; SUPcRINTENDENt

DAILY WORK FORCE REPORT1208N.xls 04.028460

CITY_21MC100_003793851

NYC-WTC_000389482

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389482Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237597

A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.

Similar indexed content

Compare copies and versions →