Daily Work Force Report, Grace Contracting

Machine-extracted title · confidence 32%

Night final daily workforce for World Trade site, Dec 19 2001.

NYC-WTC_000290107
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 1

GRACE CONTRACTING CORP. 151^5 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 19. 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions CLEAR & MILD

Labor I Equipment CLASSIFICATION QUANT. I Description MANNED ISTANDBY IDLE IISUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE ~ 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER ~ 1 SAFETY OFFICER CAT 375 GRAPPLER ~ 1 LABORERS 18 HITACHI 750 GRAPPLER ~ 1 IRON WORKERS HITACHI 550 GRAPPLER ~ 1 LOCAL 14 5 HITACHI 550 BACKHOE 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 8 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER iELIVERIES: HIGH DECK TRAILERS HARNESSES FROM AUSTER RUBBER WELDING TRUCK 1200 DIGGING IN CHILLER ROOM - UNCOVERING FUEL TRUCK 1 CHILLER ROOM COMPONENTS PICKUP TRUCKS 2 375 WORKING SLOPE - LOADING FLATS AND LIGHT TOWERS 13 EUKES SITE MULE 3 973 IN HOLE PILING DEBRIS & LOADING TTRUCKS DUMP TRUCKS 750 BEGAN NIGHT DIGGING EAST BETWEEN NORTH 10 WHEEL DUMP TRUCK WALL & CORE OF TOWER 2 THEN MOVED TO FLASHING ARROW BOARD 1 SLOPE WITH 375 OFFICE TRAILER/GENER. 1 365 ON TOP LOADING TRAILERS CARGO BOXES 4 2 HOUR DELAY - AMEC ACCESS ROAD CLOSED FLAT TRUCK 1 COULDN'T GET TRUCKS UP OR DOWN - PA WANTED PUMP 2 TULLY FLATS LOADED WITH “MONUMENT STEEL" ROLLER 1 FOR TRANSPORT TO JFKIA. RAINMAKER/GENIE LIFT 1 |aMEC WORKER INJURED - SEE ACCIDENT REPORTl Description of Work:

MAN TARPING AND TRIMMING STATIONS___________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA__________________________________________ MAN WATERING STATIONS FOR DUST CONTROL____________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT

SEE SEPARATE SHEET FOR TRUCKING

GRACE CONTRACTING CORP ^|Epproye£^ BY; [For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1219N.xls

CITY_21MC100_004715058

NYC-WTC_000290107

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290107Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237597

A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.

Similar indexed content

Compare copies and versions →